Dell Completion Certificate Maxime FEUDJIOMaxime FEUDJIO
This certificate confirms that Maxime Feudjio successfully completed the Dell Compellent Business Partner Portal Overview course on December 19, 2016. The Dell Worldwide Partner Learning and Development Team issued the certificate to acknowledge Maxime Feudjio's completion of the course. The certificate provides the name of the course completed and the date of completion.
This certificate of accreditation grants Feudjio Jiometio Maxime accreditation as an Accredited Configuration Engineer (ACE) for Palo Alto Networks after successfully completing the ACE exam for PAN-OS version 7.0 on February 2, 2017. The certificate is signed by Linda Moss, VP of Global Enablement at Palo Alto Networks.
This certificate of accreditation grants Feudjio Jiometio Maxime accreditation as an Accredited Configuration Engineer (ACE) for Palo Alto Networks after successfully completing the ACE exam for PAN-OS version 6.1. The certificate is dated February 2, 2017 and is signed by Linda Moss, VP of Global Enablement at Palo Alto Networks.
Test delivery report feudjio maxime 200 120Maxime FEUDJIO
The document provides the results of a Cisco certification exam taken by a candidate. It includes the candidate's scores on each section of the exam, which all scored 100%. The preliminary report status and next steps for the candidate to view official results online are also outlined. A passing score of 200 was achieved with the candidate's score of 825, which exceeds the minimum passing score of 200.
Alternative - Complément au Tramway et 3ème lien de la ville de Québec Daniel Bedard
An update of this presentation has been done with Slide 16 that has been updated and 17 has been added, only.
Cette présentation a été ajournée avec la diapo 16 qui a été modifié et la 17 qui a été ajouté.
Voir ici
https://www.slideshare.net/slideshow/alternative-au-tramway-de-la-ville-de-quebec-rev1-sum-pdf/269691794
CDPQ Infra dévoile un plan de mobilité de 15 G$ sur 15 ans pour la région de Québec. Une alternative plus économique et rapide, ne serait-elle pas posssible?
- Valoriser les infrastructures ferroviaires du CN, en créant un Réseau Express Métropolitain (REM) plutôt qu'un nouveau tramway ou une combinaison des 2.
- Optimiser l'utilisation des rails pour un transport combiné des marchandises et des personnes, en accordant une priorité aux déplacements des personnes aux heures de pointes.
- Intégrer un téléphérique transrives comme 3ème lien urbain dédiés aux piétons et cyclistes avec correspondance avec le REM.
- Le 3 ème lien routier est repensé en intégrant un tunnel routier qui se prolonge avec le nouveau pont de l'Île d'Orléans et quelques réaménagemet de ses chausées.
https://www.linkedin.com/in/bedarddaniel/
English:
CDPQ Infra unveils a $15 billion, 15-year mobility plan for the Quebec region. Wouldn't a more economical and faster alternative be possible?
Leverage CN's railway infrastructure by creating a Metropolitan Express Network (REM) instead of a new tramway or a combination of both.
Optimize the use of rails for combined freight and passenger transport, giving priority to passenger travel during peak hours.
Integrate a cross-river cable car as a third urban link dedicated to pedestrians and cyclists, with connections to the REM.
Rethink the third road link by integrating a road tunnel that extends with the new Île d'Orléans bridge and some reconfiguration of its lanes.
https://www.linkedin.com/in/bedarddaniel/
Dell Completion Certificate Maxime FEUDJIOMaxime FEUDJIO
This certificate confirms that Maxime Feudjio successfully completed the Dell Compellent Business Partner Portal Overview course on December 19, 2016. The Dell Worldwide Partner Learning and Development Team issued the certificate to acknowledge Maxime Feudjio's completion of the course. The certificate provides the name of the course completed and the date of completion.
This certificate of accreditation grants Feudjio Jiometio Maxime accreditation as an Accredited Configuration Engineer (ACE) for Palo Alto Networks after successfully completing the ACE exam for PAN-OS version 7.0 on February 2, 2017. The certificate is signed by Linda Moss, VP of Global Enablement at Palo Alto Networks.
This certificate of accreditation grants Feudjio Jiometio Maxime accreditation as an Accredited Configuration Engineer (ACE) for Palo Alto Networks after successfully completing the ACE exam for PAN-OS version 6.1. The certificate is dated February 2, 2017 and is signed by Linda Moss, VP of Global Enablement at Palo Alto Networks.
Test delivery report feudjio maxime 200 120Maxime FEUDJIO
The document provides the results of a Cisco certification exam taken by a candidate. It includes the candidate's scores on each section of the exam, which all scored 100%. The preliminary report status and next steps for the candidate to view official results online are also outlined. A passing score of 200 was achieved with the candidate's score of 825, which exceeds the minimum passing score of 200.
Alternative - Complément au Tramway et 3ème lien de la ville de Québec Daniel Bedard
An update of this presentation has been done with Slide 16 that has been updated and 17 has been added, only.
Cette présentation a été ajournée avec la diapo 16 qui a été modifié et la 17 qui a été ajouté.
Voir ici
https://www.slideshare.net/slideshow/alternative-au-tramway-de-la-ville-de-quebec-rev1-sum-pdf/269691794
CDPQ Infra dévoile un plan de mobilité de 15 G$ sur 15 ans pour la région de Québec. Une alternative plus économique et rapide, ne serait-elle pas posssible?
- Valoriser les infrastructures ferroviaires du CN, en créant un Réseau Express Métropolitain (REM) plutôt qu'un nouveau tramway ou une combinaison des 2.
- Optimiser l'utilisation des rails pour un transport combiné des marchandises et des personnes, en accordant une priorité aux déplacements des personnes aux heures de pointes.
- Intégrer un téléphérique transrives comme 3ème lien urbain dédiés aux piétons et cyclistes avec correspondance avec le REM.
- Le 3 ème lien routier est repensé en intégrant un tunnel routier qui se prolonge avec le nouveau pont de l'Île d'Orléans et quelques réaménagemet de ses chausées.
https://www.linkedin.com/in/bedarddaniel/
English:
CDPQ Infra unveils a $15 billion, 15-year mobility plan for the Quebec region. Wouldn't a more economical and faster alternative be possible?
Leverage CN's railway infrastructure by creating a Metropolitan Express Network (REM) instead of a new tramway or a combination of both.
Optimize the use of rails for combined freight and passenger transport, giving priority to passenger travel during peak hours.
Integrate a cross-river cable car as a third urban link dedicated to pedestrians and cyclists, with connections to the REM.
Rethink the third road link by integrating a road tunnel that extends with the new Île d'Orléans bridge and some reconfiguration of its lanes.
https://www.linkedin.com/in/bedarddaniel/
Comment aborder le changement climatique dans son métier, volet adaptation
Certificat d accomplissement-les fondements d_itil la conception des services Maxime FEUDJIO
1. Certificat d’accomplissement
Félicitations Maxime FEUDJIO
Les fondements d'ITIL : 3.
La conception des services
Cours terminé le 8 oct. 2017 • 1 heure 1 min
En poursuivant votre apprentissage, vous avez élargi vos
perspectives, affiné vos compétences et vous êtes en
meilleure position sur le marché du travail.
Id du certificat : Aby8448y_qykH-PEuZX9oPnbzbxs