SlideShare une entreprise Scribd logo
1  sur  8
Télécharger pour lire hors ligne
FISCAL DECENTRALIZATION AND HEALTH SECTOR FINANCING FORMULAE


By: Jean-Marc Lepain
    Public Finance Specialist
    Intergovernmental Fiscal Advisor, Ministry of Finance

Date:   June 8th, 2009


This paper is intended to be used as a basis for discussion between the Ministry of Health and the
Ministry of Finance for the selection of a budget norm formula for the financing of the health sector
within the framework of the forthcoming fiscal decentralization reform. It is an interim report and it
does not reflect necessarily the project final conclusions.

This report does not take into consideration needs that might arise as a result of the reform of the
health insurance system. This will be done at a latter stage of the Expenditure Need Assessment.

After reviewing the literature available on the subject1, it appears that the health sector funding
approach the most adapted to Lao PDR seems to be a formula based on area-based capitation
adjusted to take into consideration variations in costs and needs. Typically, capitation methods takes
a measure of the size and characteristics of local population, for example in the form of risk factors
and costs such as levels of disease, poverty, population structure and geography, and infers the
expected level of local service expenditure without reference to actual local health service use.
However it does not appear that the health financing formula can be based hundred percent on
capitation because of the heterogeneity of services provided across the territory of the Lao PDR and
the need to provide incentives for increasing the number of patients visiting health facilities. We
might consider disaggregating the capitation amount by broad types of services in order to avoid
allocating funds for services which are not provided. We might also consider the possibility of ex
post adjustments for adjusting the funding made available to local performance, such as number of
patients treated or number of visits to villages.

Following the various discussions we had with people in the MoH and with a number of experts
(World Bank, WHO and Swiss Red Cross), five possible approaches have been identified. Making a
choice between these different approaches should be put in the wider perspective of the health
sector financing strategy based on a national health policy framework that still need to be prepared.
MoH can decide either to adopt an interim solution based on budget norms and applicable only for
one or two budget cycles or undertake immediately the design of a health financing formula.


1
 I have paid special consideration to Formula Funding for Health Services ; Learning from Experience in some
Developed Countries, WHO Discussion Paper No 1 2008 by Peter C. Smith and Achieving Universal Health
Coverage: Developing the Health Financing System, WHO Technical Brief for Policy Makers No 1 2005, by G.
Carrin, C. James and D. Evans.
A. Selection of a formula

   1) Approach based on salaries

Based on the observation that salaries are the main expenditure in the health sector and one of the
only reliable indicators of service, we try to equalize the number of health workers and provide
incentive for remote and difficult districts. Then non-wage recurrent expenditures can be expressed
as a percentage of salaries or can be based on other indicators.

Strength of the approach:

      We are using data which are easily available
      We can disaggregate the staff numbers by categories and facilities (provincial hospital,
       district hospital, health centres)
      The formula can ensure that sufficient funding is available for non-wage recurring
       expenditures



Weakness of the approach:

      Increasing the number of civil servants is difficult in Lao DPR and requires a long process
      The equalisation impact will be very limited. There is a risk of freezing the existing situation.
      Staffing is not a good indicator of needs and the formula does not provide any mechanism
       for correcting under spending



   2) Approach based on number of health workers

This approach is very similar to the previous one. It substitute to salaries the number of health
workers to avoid the problem of variable elements in salary compensation. There is no objective of
equalization of the number of health workers. This will require the desegregation of the number of
health workers into a few categories such as: general practitioners, specialized doctors, nurses,
paramedics , etc.

Strength of the approach:

      The number of health worker is known and cannot be questioned
      This is a better approach than the number of beds because beds can be unoccupied
      This approach can be a good step in the direction of a heath financing formula or block grants


Weakness of the approach:
 This approach works well for the equalisation of non-wage expenditure but does not give a
          solution for the equalization of wage
        The equalization impact is very limited



   3) Approach based on capitation and case payments

A number of countries use formulae that combine capitation with case payments. A health facility
can be financed 60% by capitation and 40% by case payments.

Strength of the approach:

        It provides a strong incentive for increasing service outreach
        The equalization impact remains strong

Weakness of the approach:

        This approach works well only when case payments are reimbursed according the diagnosis
         and treatment of the patients. It implies knowing precisely the cost of each treatment;
         something that does not appear feasible in Lao PDR.
        The method requires a system able to check on the validity of the local data and the
         appropriateness of the services being delivered. Either it requires a large investment in it or a
         strong administrative structure. Without such system data can be easily manipulated and
         audit requirements will become costly and administratively demanding.



   4) Approach based on needs and cost

This is the simplest solution and the one that was envisaged when the Budget Norm Policy
Framework was prepared. We start from a notional level of spending per capita that we adjust in
every province to take into consideration needs and costs. For example: 20,000 kip per capita + 10%
to 20% based on a need indicator + 5% to 25% based on a cost indicator. As in the previous approach,
we ensure that a correct ratio wage/non-wage applies.

    Suggested need indicators are life expectancy, infant mortality, nutrition, percentage of
     population under the poverty line, etc.
    Suggested cost indicators are ethnic structure of the population, population density, altitude,
     etc.

Strength of this approach

        The equalization effect will be maximum
        It meets all the requirements of the budget law and would get easily political support
        The formula can ensure that sufficient funding is available for non-wage recurring
         expenditures
Weakness of this approach

       Suggested needs indicators (life expectancy, infant mortality) appear to be all questionable
       The equalization effect might be too fast resulting in allocation of funds that cannot be
        properly used. The increase of the local budget should be limited over time or based on the
        submission of an implementation plan.



    5) Approach based on cost of infrastructures and programmes

This approach combines the two previous one. It distinguishes the cost of infrastructure from the
cost of other programmes.

     Infrastructure cost is calculated by “bed” with a minimum allocation by bed that includes
      salary cost and Goods & Services and by block grant for health centres. A substitute for beds
      could be the number of qualified doctors.

     Like in the previous formula, the allocation to other programmes is calculated on the based
      of a minimum allocation per capita adjusted for cost and needs. However this time are
      calculated by programme on the basis of a 10% (or more) increase in their coverage.




Strength of this approach:

       This is the most equitable approach in terms of a balance between needs and costs
       This approach solves the problem of insufficient funding for district hospital and health
        centres. District hospital could be financed by a block grant calculated on that basis.
       It is consistent with programme budgeting which is the direction toward MoH wants to move

Weakness of this approach

       The formula become more complex
       Experience shows that at the district level the bed occupancy rate is very low. One can
        question the financing of bed if they are not used
       It might be difficult to distinguish between infrastructure cost (expenditure per bed) and
        other health services provided from the same health facilities.




    6) Approach based on cost and service delivery

This approach build on the previous one but includes some adjustments in order to take in
consideration the quantitative aspect of services provided and to offer incentives for better use of
facilities and more services provided.
The cost of beds and other infrastructure is financed only to a certain level (between 60% and 80%).
The difference is covered by a payment made on the basis of the number of patients treated (case
payments).

Other incentives are introduced in other programmes. In the case of Lao PDR we can include lump
sum payments for each visit to a village in a priority district or even modulate the lump sum by village
types.

Strength of this approach:

       It combines the advantages of the approach based on cost of infrastructure and programmes
        with a strong incentive to increase service delivery.
       The system is fairer and avoids financing facilities which are not efficiently used.

Weakness of this approach:

       The formula can become too complex and difficult to calculate.
       Data on use of services might be difficult to collect or manipulated.




    B. Conclusion of the formula selection

Approach No 1 does not bring the equalization effect required and in fact exacerbate horizontal
imbalance for non-wage expenditures. According to a test run with the macro fiscal model when
wage expenditure fluctuate between 13,000 kips and 23,000 kips (if we exclude Vientiane Capital and
Attapeu which are special cases), non wage expenditures fluctuate between 7% and 94% of wage
expenditures.

The conclusion that we should draw from the test is that we might consider limiting the capitation to
non-wage expenditure. Equalization of salaries and compensation is impossible in the short term and
should be considered as a long term goal that requires a proper mechanism.



Approach No 2 is the one MoF’s Budget Department favors the more because it does not raise the
issue of salaries and the equalization of wage expenditure. A formula limited to non-wage
expenditures should take in consideration the staff structure of the health sector, the deployment of
programmes in a given province, specific need factors and factors that affect cost of service delivery.

Approach No 3 appears to be impracticable in Lao PDR.

Approach 4 and 5 appear as good candidate for the interim formula if we accept that the final health
financing formula should be developed over one or two years. A financing based on the number of
beds does not appear as a good approach due to the very low occupancy rate. That leaves the
number of qualified doctors as the only indicator of need.
Approach 6 can be considered, but look more like a basis for a more elaborated health financing
formula.

So far the best approach seems to be Approach No 2 seen as a transition formula toward a Health
Financing Formula developed on the basis of approach No 4 with a strong incentive component
and a clear objective of increasing the utilisation of heath facilities.



    C. Analysis of cost drivers

The main cost drivers in Lao PDR seem to be geography and population structure. Reaching
minorities in high lands is more expensive than reaching Lao Loums in Mekong plain. Probably the
best approach would be classifying provinces and districts in four or five broad categories associated
with different cost levels based on some characteristics such percentage of minorities, percentage of
urban population, population density, etc.



    D. Decisions that need to be made

     We need to decide the scope of the financing formula. Certain health services might be
      excluded from the formula and financed by ad hoc grants. It might be the case of specialized
      hospitals. The formula should be linked to a health package available on a national basis.
     At the moment it looks more likely that budget norms for the health sector will be
      introduced in different stages. The different stages could be (a) a formula for non-wage
      expenditure, (b) a formula for intergovernmental transfers giving an indication on the broas
      size of the general budget in the provinces, (c) a complete health financing formula
     MoH needs to look at the process for rationalizing the number of health workers in provinces
      by developing staffing norms.
     Do we take a full-fledge capitation approach based on a minimum spending per capita
      (approach 1 and 2) or do we want to disaggregate the formula in a number of service type?
     Do we want to use the health financing formula to provide incentive for heath delivery?



    E. Conclusion and Recommendations

Designing a complete health financing formula is a complex task that cannot be rushed. It can be
done only when a number of health policy issues have been clarified such has the content of the
health package, the new universal insurance scheme, user fee policy, incentive policy, and hospital
management autonomy. We expect that these issues will be clarified within a year when a Health
Policy Paper will be published as part of PRSO triggers.

From the previous analysis we are able to make a few recommendations:

       An interim budget norm formula applying for one or two budget cycles seems to be the best
        approach. A full-fledge health formula can de develop in parallel in one or two stages an
        introduced for the preparation of 2010/11 budget.
   The interim formula should prefigure the health financing formula in order to avoid any
    disruption.
   Health facilities, activities and programmes outside the scope of the formula should be
    identified immediately and will be financed through ad hoc grants.
   The selection of the formula should be based on its equalization effect and on its capacity to
    ensure that sufficient funding is available for non-wage recurring expenditures.
   At this stage there is no guarantee that an increase in non-wage recurrent budget will cause
    a reduction of user fees. This objective can only be achieved if proper instructions are given
    to health facilities. Work on user fee policy and instructions (or regulation) should start in
    parallel with the design of the budget norm formula.
   Additional components of the formula such as incentive, program financing desegregation
    and availability of funds at the district level will be reviewed in the next forth coming weeks
    and it will be decided if they become part of the interim formula or not.
   If the option of an interim formula is chosen, it is important to create a dynamic with time
    constrains that will ensure that the final outcome (the complete heath financing formula) is
    not postponed indefinitely. Objectives of the health financing formula should be defined in
    the Health Policy Paper under preparation.
   A satisfactory health financing formula requires better data than exist presently in Lao DPR.
    For that reason we believe that the health financing formula should de developed in several
    stages. Meanwhile other actions must be taken:
                           o A database must be created for the systematic collection of health
                                management data;
                           o A statistical model for analysing spending variations amongst health
                                facilities, programmes, provinces and districts must be developed ;
                           o The Medium-Term Expenditure Framework (MTEF) must be
                                completed;
                           o The MTEF should be used to create a link between investment
                                decisions and recurrent costs. No investment should be approved
                                unless there is sufficient additional funding for its operation and
                                maintenance.
                           o A more detailed heath budget must be produced and consideration
                                should be given to the introduction of programme budgeting;
                           o The health budget should include user fees and user fees should be
                                reflected in the national budget;
                           o Accounting rules should be revised in order to provide better
                                information on central/local expenditures, recurrent/investment
                                expenditures and the used of donors’ funding.
                           o A reporting mechanism on budget execution should be put in place
                                between Provincial Health Offices and MoH. This reporting
                                mechanism should provide data by district, by programme and by
                                health facility
                           o User fees should be fully reflected in health facilities’ accounting and
                                proper regulation must ensure that user fees are always linked to a
                                traceable service.
o   For the sake of reporting, transparency and effective public finance
                                management, an agreement should be reached with the Treasury
                                for they management through the Single Treasury Account while
                                ensuring that the fund collected remain fully available at the local
                                level.
                            o   In accordance with good public finance management practices, user
                                fees should be included as resource of the Health Budget.



    F. Way forward

In the first stage this paper will be used as a basis for discussion in an informal way. The objective
will be to eliminate impracticable approaches, identified other possible options and refine the
strategy. When a consensus will have emerged we might consider organizing a round table to reach a
final decision.

Contenu connexe

Tendances

Macro fiscal model for the costing of education sector budget norms (laos 2009)
Macro fiscal model for the costing of education sector budget norms (laos 2009)Macro fiscal model for the costing of education sector budget norms (laos 2009)
Macro fiscal model for the costing of education sector budget norms (laos 2009)Jean-Marc Lepain
 
Investment planning and public investment plans: Inssues and Best Practices
Investment planning and public investment plans: Inssues and Best PracticesInvestment planning and public investment plans: Inssues and Best Practices
Investment planning and public investment plans: Inssues and Best PracticesJean-Marc Lepain
 
Budgeting in Chile - Camila Vammalle, OECD
Budgeting in Chile - Camila Vammalle, OECDBudgeting in Chile - Camila Vammalle, OECD
Budgeting in Chile - Camila Vammalle, OECDOECD Governance
 
Punjab resource management programme; intervention in finance department
Punjab resource management programme; intervention in finance departmentPunjab resource management programme; intervention in finance department
Punjab resource management programme; intervention in finance departmentJean-Marc Lepain
 
Medim Term Budget Framework Seminar: background and objectives
Medim Term Budget Framework Seminar:  background  and objectives Medim Term Budget Framework Seminar:  background  and objectives
Medim Term Budget Framework Seminar: background and objectives Jean-Marc Lepain
 
Performance Informed Budgeting and Spending Reviews in Canada - Marcia Santia...
Performance Informed Budgeting and Spending Reviews in Canada - Marcia Santia...Performance Informed Budgeting and Spending Reviews in Canada - Marcia Santia...
Performance Informed Budgeting and Spending Reviews in Canada - Marcia Santia...OECD Governance
 
Enhancing the Finance Function in Line Ministries - Jon Blöndal, OECD
Enhancing the Finance Function in Line Ministries - Jon Blöndal, OECDEnhancing the Finance Function in Line Ministries - Jon Blöndal, OECD
Enhancing the Finance Function in Line Ministries - Jon Blöndal, OECDOECD Governance
 
Spending Reviews - Naida CARSIMAMOVIC, World Bank
Spending Reviews - Naida CARSIMAMOVIC, World BankSpending Reviews - Naida CARSIMAMOVIC, World Bank
Spending Reviews - Naida CARSIMAMOVIC, World BankOECD Governance
 
Strengthening provincial planning and budgeting capacity (laos 2010)
Strengthening provincial planning and budgeting capacity (laos 2010)Strengthening provincial planning and budgeting capacity (laos 2010)
Strengthening provincial planning and budgeting capacity (laos 2010)Jean-Marc Lepain
 
Budget documentation and the pre-budget statetement paper
Budget documentation and the pre-budget statetement paperBudget documentation and the pre-budget statetement paper
Budget documentation and the pre-budget statetement paperJean-Marc Lepain
 
France Budget Framework - Marine Camiade, France
France Budget Framework - Marine Camiade, FranceFrance Budget Framework - Marine Camiade, France
France Budget Framework - Marine Camiade, FranceOECD Governance
 
Fiscal Planning and Public Finance Management Reforms
Fiscal Planning and Public Finance Management ReformsFiscal Planning and Public Finance Management Reforms
Fiscal Planning and Public Finance Management ReformsJean-Marc Lepain
 
Accrual Accounting and Budgeting ... Australia's experience - Jane Halton, Au...
Accrual Accounting and Budgeting ... Australia's experience - Jane Halton, Au...Accrual Accounting and Budgeting ... Australia's experience - Jane Halton, Au...
Accrual Accounting and Budgeting ... Australia's experience - Jane Halton, Au...OECD Governance
 
Using Performance Data to Inform Budgeting at the Subnational Level: The Onta...
Using Performance Data to Inform Budgeting at the Subnational Level: The Onta...Using Performance Data to Inform Budgeting at the Subnational Level: The Onta...
Using Performance Data to Inform Budgeting at the Subnational Level: The Onta...OECD Governance
 
Capital Budgeting - Iryna SCHERBYNA, World Bank
Capital Budgeting - Iryna SCHERBYNA, World BankCapital Budgeting - Iryna SCHERBYNA, World Bank
Capital Budgeting - Iryna SCHERBYNA, World BankOECD Governance
 
Budget Review of Sweden -- Comments and Questions - Hannu Mäkinen, Finland
Budget Review of Sweden -- Comments and Questions - Hannu Mäkinen, FinlandBudget Review of Sweden -- Comments and Questions - Hannu Mäkinen, Finland
Budget Review of Sweden -- Comments and Questions - Hannu Mäkinen, FinlandOECD Governance
 
OECD, 35th Meeting of Senior Budget Officials - Lars Ostergaard - Denmark
 OECD, 35th Meeting of Senior Budget Officials - Lars Ostergaard - Denmark OECD, 35th Meeting of Senior Budget Officials - Lars Ostergaard - Denmark
OECD, 35th Meeting of Senior Budget Officials - Lars Ostergaard - DenmarkOECD Governance
 
Implementing Spending Reviews: Dilemmas and Choices by Martin Kelleners
Implementing Spending Reviews: Dilemmas and Choices by Martin Kelleners Implementing Spending Reviews: Dilemmas and Choices by Martin Kelleners
Implementing Spending Reviews: Dilemmas and Choices by Martin Kelleners OECD Governance
 
APPLICATION OF MEDIUM TERM EXPENDITURE FRAMEWORK- A CASE STUDY OF TAMIL NADU
APPLICATION OF MEDIUM TERM EXPENDITURE FRAMEWORK- A CASE STUDY OF TAMIL NADUAPPLICATION OF MEDIUM TERM EXPENDITURE FRAMEWORK- A CASE STUDY OF TAMIL NADU
APPLICATION OF MEDIUM TERM EXPENDITURE FRAMEWORK- A CASE STUDY OF TAMIL NADUSultan Odin
 
Performance Budgeting: The French Experience by Veronique Fouque
Performance Budgeting: The French Experience by Veronique FouquePerformance Budgeting: The French Experience by Veronique Fouque
Performance Budgeting: The French Experience by Veronique FouqueOECD Governance
 

Tendances (20)

Macro fiscal model for the costing of education sector budget norms (laos 2009)
Macro fiscal model for the costing of education sector budget norms (laos 2009)Macro fiscal model for the costing of education sector budget norms (laos 2009)
Macro fiscal model for the costing of education sector budget norms (laos 2009)
 
Investment planning and public investment plans: Inssues and Best Practices
Investment planning and public investment plans: Inssues and Best PracticesInvestment planning and public investment plans: Inssues and Best Practices
Investment planning and public investment plans: Inssues and Best Practices
 
Budgeting in Chile - Camila Vammalle, OECD
Budgeting in Chile - Camila Vammalle, OECDBudgeting in Chile - Camila Vammalle, OECD
Budgeting in Chile - Camila Vammalle, OECD
 
Punjab resource management programme; intervention in finance department
Punjab resource management programme; intervention in finance departmentPunjab resource management programme; intervention in finance department
Punjab resource management programme; intervention in finance department
 
Medim Term Budget Framework Seminar: background and objectives
Medim Term Budget Framework Seminar:  background  and objectives Medim Term Budget Framework Seminar:  background  and objectives
Medim Term Budget Framework Seminar: background and objectives
 
Performance Informed Budgeting and Spending Reviews in Canada - Marcia Santia...
Performance Informed Budgeting and Spending Reviews in Canada - Marcia Santia...Performance Informed Budgeting and Spending Reviews in Canada - Marcia Santia...
Performance Informed Budgeting and Spending Reviews in Canada - Marcia Santia...
 
Enhancing the Finance Function in Line Ministries - Jon Blöndal, OECD
Enhancing the Finance Function in Line Ministries - Jon Blöndal, OECDEnhancing the Finance Function in Line Ministries - Jon Blöndal, OECD
Enhancing the Finance Function in Line Ministries - Jon Blöndal, OECD
 
Spending Reviews - Naida CARSIMAMOVIC, World Bank
Spending Reviews - Naida CARSIMAMOVIC, World BankSpending Reviews - Naida CARSIMAMOVIC, World Bank
Spending Reviews - Naida CARSIMAMOVIC, World Bank
 
Strengthening provincial planning and budgeting capacity (laos 2010)
Strengthening provincial planning and budgeting capacity (laos 2010)Strengthening provincial planning and budgeting capacity (laos 2010)
Strengthening provincial planning and budgeting capacity (laos 2010)
 
Budget documentation and the pre-budget statetement paper
Budget documentation and the pre-budget statetement paperBudget documentation and the pre-budget statetement paper
Budget documentation and the pre-budget statetement paper
 
France Budget Framework - Marine Camiade, France
France Budget Framework - Marine Camiade, FranceFrance Budget Framework - Marine Camiade, France
France Budget Framework - Marine Camiade, France
 
Fiscal Planning and Public Finance Management Reforms
Fiscal Planning and Public Finance Management ReformsFiscal Planning and Public Finance Management Reforms
Fiscal Planning and Public Finance Management Reforms
 
Accrual Accounting and Budgeting ... Australia's experience - Jane Halton, Au...
Accrual Accounting and Budgeting ... Australia's experience - Jane Halton, Au...Accrual Accounting and Budgeting ... Australia's experience - Jane Halton, Au...
Accrual Accounting and Budgeting ... Australia's experience - Jane Halton, Au...
 
Using Performance Data to Inform Budgeting at the Subnational Level: The Onta...
Using Performance Data to Inform Budgeting at the Subnational Level: The Onta...Using Performance Data to Inform Budgeting at the Subnational Level: The Onta...
Using Performance Data to Inform Budgeting at the Subnational Level: The Onta...
 
Capital Budgeting - Iryna SCHERBYNA, World Bank
Capital Budgeting - Iryna SCHERBYNA, World BankCapital Budgeting - Iryna SCHERBYNA, World Bank
Capital Budgeting - Iryna SCHERBYNA, World Bank
 
Budget Review of Sweden -- Comments and Questions - Hannu Mäkinen, Finland
Budget Review of Sweden -- Comments and Questions - Hannu Mäkinen, FinlandBudget Review of Sweden -- Comments and Questions - Hannu Mäkinen, Finland
Budget Review of Sweden -- Comments and Questions - Hannu Mäkinen, Finland
 
OECD, 35th Meeting of Senior Budget Officials - Lars Ostergaard - Denmark
 OECD, 35th Meeting of Senior Budget Officials - Lars Ostergaard - Denmark OECD, 35th Meeting of Senior Budget Officials - Lars Ostergaard - Denmark
OECD, 35th Meeting of Senior Budget Officials - Lars Ostergaard - Denmark
 
Implementing Spending Reviews: Dilemmas and Choices by Martin Kelleners
Implementing Spending Reviews: Dilemmas and Choices by Martin Kelleners Implementing Spending Reviews: Dilemmas and Choices by Martin Kelleners
Implementing Spending Reviews: Dilemmas and Choices by Martin Kelleners
 
APPLICATION OF MEDIUM TERM EXPENDITURE FRAMEWORK- A CASE STUDY OF TAMIL NADU
APPLICATION OF MEDIUM TERM EXPENDITURE FRAMEWORK- A CASE STUDY OF TAMIL NADUAPPLICATION OF MEDIUM TERM EXPENDITURE FRAMEWORK- A CASE STUDY OF TAMIL NADU
APPLICATION OF MEDIUM TERM EXPENDITURE FRAMEWORK- A CASE STUDY OF TAMIL NADU
 
Performance Budgeting: The French Experience by Veronique Fouque
Performance Budgeting: The French Experience by Veronique FouquePerformance Budgeting: The French Experience by Veronique Fouque
Performance Budgeting: The French Experience by Veronique Fouque
 

Similaire à Fiscal decentralisation and health sector financing formulae (lao pdr)

Financial mana of healthcare 7th lec
Financial mana of healthcare  7th lec Financial mana of healthcare  7th lec
Financial mana of healthcare 7th lec Mahmoud Shaqria
 
Myanmar Strategic Purchasing 2: Calculating a Capitation Payment
Myanmar Strategic Purchasing 2: Calculating a Capitation PaymentMyanmar Strategic Purchasing 2: Calculating a Capitation Payment
Myanmar Strategic Purchasing 2: Calculating a Capitation PaymentHFG Project
 
MultiFactorIncentivePaySystem--ABSTRECTABSTRACTFINAL_4.29.11
MultiFactorIncentivePaySystem--ABSTRECTABSTRACTFINAL_4.29.11MultiFactorIncentivePaySystem--ABSTRECTABSTRACTFINAL_4.29.11
MultiFactorIncentivePaySystem--ABSTRECTABSTRACTFINAL_4.29.11Chrisovalantou Russo
 
Case study on establishing low cost hospitals in 4 states with low health ind...
Case study on establishing low cost hospitals in 4 states with low health ind...Case study on establishing low cost hospitals in 4 states with low health ind...
Case study on establishing low cost hospitals in 4 states with low health ind...Shubhenduchakravorty
 
Value-Based Purchasing and the Role of Home Care Technology
Value-Based Purchasing and the Role of Home Care TechnologyValue-Based Purchasing and the Role of Home Care Technology
Value-Based Purchasing and the Role of Home Care TechnologyAlayaCare
 
Hospital case costing method infographic
Hospital case costing method infographicHospital case costing method infographic
Hospital case costing method infographicleadingphysicianofworld
 
Expenditure Management for UHC
Expenditure Management for UHCExpenditure Management for UHC
Expenditure Management for UHCHFG Project
 
Lessons from pfm in the health sector final
Lessons from pfm in the health sector finalLessons from pfm in the health sector final
Lessons from pfm in the health sector finalHFG Project
 
Payment Rules are Changing. Are You?
Payment Rules are Changing. Are You?Payment Rules are Changing. Are You?
Payment Rules are Changing. Are You?NextGen Healthcare
 
Section27 Health Reform Brief 1 July 2013
Section27 Health Reform Brief 1 July 2013Section27 Health Reform Brief 1 July 2013
Section27 Health Reform Brief 1 July 2013Section 27
 
1508SocialImpactBondsPublicHealthPrograms
1508SocialImpactBondsPublicHealthPrograms1508SocialImpactBondsPublicHealthPrograms
1508SocialImpactBondsPublicHealthProgramsL. Aidan Renaghan
 
Population Health Management
Population Health ManagementPopulation Health Management
Population Health ManagementVitreosHealth
 
Stanislaus 2015 White Paper
Stanislaus 2015 White PaperStanislaus 2015 White Paper
Stanislaus 2015 White PaperEric Barthel
 
NHC Essential Health Benefits Recommendations
NHC Essential Health Benefits RecommendationsNHC Essential Health Benefits Recommendations
NHC Essential Health Benefits RecommendationsNational Health Council
 
Healthcare Quality Coalition letter
Healthcare Quality Coalition letterHealthcare Quality Coalition letter
Healthcare Quality Coalition letterPost-Bulletin Co.
 
Ac Os Bundled Payments
Ac Os Bundled PaymentsAc Os Bundled Payments
Ac Os Bundled PaymentsJoe White
 
Value-Based Healthcare Strategies
Value-Based Healthcare StrategiesValue-Based Healthcare Strategies
Value-Based Healthcare StrategiesColin Bertram
 

Similaire à Fiscal decentralisation and health sector financing formulae (lao pdr) (20)

Financial mana of healthcare 7th lec
Financial mana of healthcare  7th lec Financial mana of healthcare  7th lec
Financial mana of healthcare 7th lec
 
Myanmar Strategic Purchasing 2: Calculating a Capitation Payment
Myanmar Strategic Purchasing 2: Calculating a Capitation PaymentMyanmar Strategic Purchasing 2: Calculating a Capitation Payment
Myanmar Strategic Purchasing 2: Calculating a Capitation Payment
 
MultiFactorIncentivePaySystem--ABSTRECTABSTRACTFINAL_4.29.11
MultiFactorIncentivePaySystem--ABSTRECTABSTRACTFINAL_4.29.11MultiFactorIncentivePaySystem--ABSTRECTABSTRACTFINAL_4.29.11
MultiFactorIncentivePaySystem--ABSTRECTABSTRACTFINAL_4.29.11
 
Case study on establishing low cost hospitals in 4 states with low health ind...
Case study on establishing low cost hospitals in 4 states with low health ind...Case study on establishing low cost hospitals in 4 states with low health ind...
Case study on establishing low cost hospitals in 4 states with low health ind...
 
Value-Based Purchasing and the Role of Home Care Technology
Value-Based Purchasing and the Role of Home Care TechnologyValue-Based Purchasing and the Role of Home Care Technology
Value-Based Purchasing and the Role of Home Care Technology
 
Hospital case costing method infographic
Hospital case costing method infographicHospital case costing method infographic
Hospital case costing method infographic
 
Expenditure Management for UHC
Expenditure Management for UHCExpenditure Management for UHC
Expenditure Management for UHC
 
Boutin essential benefits
Boutin essential benefitsBoutin essential benefits
Boutin essential benefits
 
Lessons from pfm in the health sector final
Lessons from pfm in the health sector finalLessons from pfm in the health sector final
Lessons from pfm in the health sector final
 
Payment Rules are Changing. Are You?
Payment Rules are Changing. Are You?Payment Rules are Changing. Are You?
Payment Rules are Changing. Are You?
 
Section27 Health Reform Brief 1 July 2013
Section27 Health Reform Brief 1 July 2013Section27 Health Reform Brief 1 July 2013
Section27 Health Reform Brief 1 July 2013
 
1508SocialImpactBondsPublicHealthPrograms
1508SocialImpactBondsPublicHealthPrograms1508SocialImpactBondsPublicHealthPrograms
1508SocialImpactBondsPublicHealthPrograms
 
Population Health Management
Population Health ManagementPopulation Health Management
Population Health Management
 
Stanislaus 2015 White Paper
Stanislaus 2015 White PaperStanislaus 2015 White Paper
Stanislaus 2015 White Paper
 
NHC Essential Health Benefits Recommendations
NHC Essential Health Benefits RecommendationsNHC Essential Health Benefits Recommendations
NHC Essential Health Benefits Recommendations
 
Healthcare Quality Coalition letter
Healthcare Quality Coalition letterHealthcare Quality Coalition letter
Healthcare Quality Coalition letter
 
Ac Os Bundled Payments
Ac Os Bundled PaymentsAc Os Bundled Payments
Ac Os Bundled Payments
 
Inception2
Inception2Inception2
Inception2
 
COSTING.DOC
COSTING.DOCCOSTING.DOC
COSTING.DOC
 
Value-Based Healthcare Strategies
Value-Based Healthcare StrategiesValue-Based Healthcare Strategies
Value-Based Healthcare Strategies
 

Plus de Jean-Marc Lepain

Public investment plan_management
Public investment plan_managementPublic investment plan_management
Public investment plan_managementJean-Marc Lepain
 
Budgeting and investment management in post conflict countries
Budgeting and investment management in post conflict countriesBudgeting and investment management in post conflict countries
Budgeting and investment management in post conflict countriesJean-Marc Lepain
 
Fiscal consolidation manual
Fiscal consolidation manualFiscal consolidation manual
Fiscal consolidation manualJean-Marc Lepain
 
Fiscal Consolidation and Policy Reviews
Fiscal Consolidation and Policy ReviewsFiscal Consolidation and Policy Reviews
Fiscal Consolidation and Policy ReviewsJean-Marc Lepain
 
The construction of expenditure ceilings part i v2 ed
The construction of expenditure  ceilings part i v2 edThe construction of expenditure  ceilings part i v2 ed
The construction of expenditure ceilings part i v2 edJean-Marc Lepain
 
Introducing and Implementing a new Chart of Accounts in Government
Introducing and Implementing a new Chart of Accounts in GovernmentIntroducing and Implementing a new Chart of Accounts in Government
Introducing and Implementing a new Chart of Accounts in GovernmentJean-Marc Lepain
 
Developping a chart_of_accounts
Developping a chart_of_accountsDevelopping a chart_of_accounts
Developping a chart_of_accountsJean-Marc Lepain
 
La gestion des finances publiques par programme: presentation du cour
La gestion des finances publiques par programme: presentation du courLa gestion des finances publiques par programme: presentation du cour
La gestion des finances publiques par programme: presentation du courJean-Marc Lepain
 
Les pre-reqis de la gestion budgetaire par programme
Les pre-reqis de la gestion budgetaire par programmeLes pre-reqis de la gestion budgetaire par programme
Les pre-reqis de la gestion budgetaire par programmeJean-Marc Lepain
 
La Mise en Oeuvre des Programmes: La Conception
La Mise en Oeuvre des Programmes: La ConceptionLa Mise en Oeuvre des Programmes: La Conception
La Mise en Oeuvre des Programmes: La ConceptionJean-Marc Lepain
 
La mise en oeuvre des programmes: la gestion
La mise en oeuvre des programmes: la gestionLa mise en oeuvre des programmes: la gestion
La mise en oeuvre des programmes: la gestionJean-Marc Lepain
 
L'execution des budgets-programmes
L'execution des budgets-programmesL'execution des budgets-programmes
L'execution des budgets-programmesJean-Marc Lepain
 
Suivi et Evaluation des Programmes Budgetaires
Suivi et Evaluation des Programmes BudgetairesSuivi et Evaluation des Programmes Budgetaires
Suivi et Evaluation des Programmes BudgetairesJean-Marc Lepain
 
La LOLF francaise: les raisons d'un echec
La LOLF francaise: les raisons d'un echecLa LOLF francaise: les raisons d'un echec
La LOLF francaise: les raisons d'un echecJean-Marc Lepain
 
La Gestion Budgetaire par Programme aux Philippines
La Gestion Budgetaire par Programme aux PhilippinesLa Gestion Budgetaire par Programme aux Philippines
La Gestion Budgetaire par Programme aux PhilippinesJean-Marc Lepain
 
Seminaire: Comorendre et maitriser les budgets par programme: de la preparati...
Seminaire: Comorendre et maitriser les budgets par programme: de la preparati...Seminaire: Comorendre et maitriser les budgets par programme: de la preparati...
Seminaire: Comorendre et maitriser les budgets par programme: de la preparati...Jean-Marc Lepain
 
Medium Term Budget Frameworks in West Africa: Lessons learnt
Medium Term Budget Frameworks in West Africa: Lessons learntMedium Term Budget Frameworks in West Africa: Lessons learnt
Medium Term Budget Frameworks in West Africa: Lessons learntJean-Marc Lepain
 
Construction of expenditure ceilings
Construction of expenditure ceilingsConstruction of expenditure ceilings
Construction of expenditure ceilingsJean-Marc Lepain
 

Plus de Jean-Marc Lepain (20)

Public investment plan_management
Public investment plan_managementPublic investment plan_management
Public investment plan_management
 
Budgeting and investment management in post conflict countries
Budgeting and investment management in post conflict countriesBudgeting and investment management in post conflict countries
Budgeting and investment management in post conflict countries
 
Fiscal consolidation manual
Fiscal consolidation manualFiscal consolidation manual
Fiscal consolidation manual
 
Fiscal Consolidation and Policy Reviews
Fiscal Consolidation and Policy ReviewsFiscal Consolidation and Policy Reviews
Fiscal Consolidation and Policy Reviews
 
The construction of expenditure ceilings part i v2 ed
The construction of expenditure  ceilings part i v2 edThe construction of expenditure  ceilings part i v2 ed
The construction of expenditure ceilings part i v2 ed
 
Asset recording
Asset recordingAsset recording
Asset recording
 
Introducing and Implementing a new Chart of Accounts in Government
Introducing and Implementing a new Chart of Accounts in GovernmentIntroducing and Implementing a new Chart of Accounts in Government
Introducing and Implementing a new Chart of Accounts in Government
 
Developping a chart_of_accounts
Developping a chart_of_accountsDevelopping a chart_of_accounts
Developping a chart_of_accounts
 
La gestion des finances publiques par programme: presentation du cour
La gestion des finances publiques par programme: presentation du courLa gestion des finances publiques par programme: presentation du cour
La gestion des finances publiques par programme: presentation du cour
 
Les pre-reqis de la gestion budgetaire par programme
Les pre-reqis de la gestion budgetaire par programmeLes pre-reqis de la gestion budgetaire par programme
Les pre-reqis de la gestion budgetaire par programme
 
La Mise en Oeuvre des Programmes: La Conception
La Mise en Oeuvre des Programmes: La ConceptionLa Mise en Oeuvre des Programmes: La Conception
La Mise en Oeuvre des Programmes: La Conception
 
La mise en oeuvre des programmes: la gestion
La mise en oeuvre des programmes: la gestionLa mise en oeuvre des programmes: la gestion
La mise en oeuvre des programmes: la gestion
 
L'execution des budgets-programmes
L'execution des budgets-programmesL'execution des budgets-programmes
L'execution des budgets-programmes
 
Montréal 4b
Montréal 4bMontréal 4b
Montréal 4b
 
Suivi et Evaluation des Programmes Budgetaires
Suivi et Evaluation des Programmes BudgetairesSuivi et Evaluation des Programmes Budgetaires
Suivi et Evaluation des Programmes Budgetaires
 
La LOLF francaise: les raisons d'un echec
La LOLF francaise: les raisons d'un echecLa LOLF francaise: les raisons d'un echec
La LOLF francaise: les raisons d'un echec
 
La Gestion Budgetaire par Programme aux Philippines
La Gestion Budgetaire par Programme aux PhilippinesLa Gestion Budgetaire par Programme aux Philippines
La Gestion Budgetaire par Programme aux Philippines
 
Seminaire: Comorendre et maitriser les budgets par programme: de la preparati...
Seminaire: Comorendre et maitriser les budgets par programme: de la preparati...Seminaire: Comorendre et maitriser les budgets par programme: de la preparati...
Seminaire: Comorendre et maitriser les budgets par programme: de la preparati...
 
Medium Term Budget Frameworks in West Africa: Lessons learnt
Medium Term Budget Frameworks in West Africa: Lessons learntMedium Term Budget Frameworks in West Africa: Lessons learnt
Medium Term Budget Frameworks in West Africa: Lessons learnt
 
Construction of expenditure ceilings
Construction of expenditure ceilingsConstruction of expenditure ceilings
Construction of expenditure ceilings
 

Dernier

Housewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment Booking
Housewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment BookingHousewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment Booking
Housewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment Bookingnarwatsonia7
 
Kolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
Kolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call NowKolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
Kolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call NowNehru place Escorts
 
VIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service Mumbai
VIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service MumbaiVIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service Mumbai
VIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service Mumbaisonalikaur4
 
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...narwatsonia7
 
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...Miss joya
 
Book Call Girls in Yelahanka - For 7001305949 Cheap & Best with original Photos
Book Call Girls in Yelahanka - For 7001305949 Cheap & Best with original PhotosBook Call Girls in Yelahanka - For 7001305949 Cheap & Best with original Photos
Book Call Girls in Yelahanka - For 7001305949 Cheap & Best with original Photosnarwatsonia7
 
Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...
Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...
Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...narwatsonia7
 
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Call Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Nandini 7001305949 Independent Escort Service BangaloreCall Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalorenarwatsonia7
 
call girls in Connaught Place DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in Connaught Place  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in Connaught Place  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in Connaught Place DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...saminamagar
 
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment BookingCall Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment Bookingnarwatsonia7
 
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking ModelsMumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Modelssonalikaur4
 
call girls in green park DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in green park  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in green park  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in green park DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Call Girls Whitefield Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Whitefield Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Whitefield Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Whitefield Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy GirlsCall Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girlsnehamumbai
 
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...
Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...
Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...narwatsonia7
 
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...Miss joya
 
High Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service Jaipur
High Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service JaipurHigh Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service Jaipur
High Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service Jaipurparulsinha
 

Dernier (20)

Housewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment Booking
Housewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment BookingHousewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment Booking
Housewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment Booking
 
Kolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
Kolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call NowKolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
Kolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
 
VIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service Mumbai
VIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service MumbaiVIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service Mumbai
VIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service Mumbai
 
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
 
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
 
Book Call Girls in Yelahanka - For 7001305949 Cheap & Best with original Photos
Book Call Girls in Yelahanka - For 7001305949 Cheap & Best with original PhotosBook Call Girls in Yelahanka - For 7001305949 Cheap & Best with original Photos
Book Call Girls in Yelahanka - For 7001305949 Cheap & Best with original Photos
 
Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...
Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...
Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...
 
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
 
Call Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Nandini 7001305949 Independent Escort Service BangaloreCall Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
 
call girls in Connaught Place DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in Connaught Place  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in Connaught Place  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in Connaught Place DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
 
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment BookingCall Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
 
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking ModelsMumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
 
call girls in green park DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in green park  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in green park  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in green park DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Call Girls Whitefield Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Whitefield Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Whitefield Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Whitefield Just Call 7001305949 Top Class Call Girl Service Available
 
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy GirlsCall Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
 
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
 
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
 
Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...
Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...
Russian Call Girl Brookfield - 7001305949 Escorts Service 50% Off with Cash O...
 
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
 
High Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service Jaipur
High Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service JaipurHigh Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service Jaipur
High Profile Call Girls Jaipur Vani 8445551418 Independent Escort Service Jaipur
 

Fiscal decentralisation and health sector financing formulae (lao pdr)

  • 1. FISCAL DECENTRALIZATION AND HEALTH SECTOR FINANCING FORMULAE By: Jean-Marc Lepain Public Finance Specialist Intergovernmental Fiscal Advisor, Ministry of Finance Date: June 8th, 2009 This paper is intended to be used as a basis for discussion between the Ministry of Health and the Ministry of Finance for the selection of a budget norm formula for the financing of the health sector within the framework of the forthcoming fiscal decentralization reform. It is an interim report and it does not reflect necessarily the project final conclusions. This report does not take into consideration needs that might arise as a result of the reform of the health insurance system. This will be done at a latter stage of the Expenditure Need Assessment. After reviewing the literature available on the subject1, it appears that the health sector funding approach the most adapted to Lao PDR seems to be a formula based on area-based capitation adjusted to take into consideration variations in costs and needs. Typically, capitation methods takes a measure of the size and characteristics of local population, for example in the form of risk factors and costs such as levels of disease, poverty, population structure and geography, and infers the expected level of local service expenditure without reference to actual local health service use. However it does not appear that the health financing formula can be based hundred percent on capitation because of the heterogeneity of services provided across the territory of the Lao PDR and the need to provide incentives for increasing the number of patients visiting health facilities. We might consider disaggregating the capitation amount by broad types of services in order to avoid allocating funds for services which are not provided. We might also consider the possibility of ex post adjustments for adjusting the funding made available to local performance, such as number of patients treated or number of visits to villages. Following the various discussions we had with people in the MoH and with a number of experts (World Bank, WHO and Swiss Red Cross), five possible approaches have been identified. Making a choice between these different approaches should be put in the wider perspective of the health sector financing strategy based on a national health policy framework that still need to be prepared. MoH can decide either to adopt an interim solution based on budget norms and applicable only for one or two budget cycles or undertake immediately the design of a health financing formula. 1 I have paid special consideration to Formula Funding for Health Services ; Learning from Experience in some Developed Countries, WHO Discussion Paper No 1 2008 by Peter C. Smith and Achieving Universal Health Coverage: Developing the Health Financing System, WHO Technical Brief for Policy Makers No 1 2005, by G. Carrin, C. James and D. Evans.
  • 2. A. Selection of a formula 1) Approach based on salaries Based on the observation that salaries are the main expenditure in the health sector and one of the only reliable indicators of service, we try to equalize the number of health workers and provide incentive for remote and difficult districts. Then non-wage recurrent expenditures can be expressed as a percentage of salaries or can be based on other indicators. Strength of the approach:  We are using data which are easily available  We can disaggregate the staff numbers by categories and facilities (provincial hospital, district hospital, health centres)  The formula can ensure that sufficient funding is available for non-wage recurring expenditures Weakness of the approach:  Increasing the number of civil servants is difficult in Lao DPR and requires a long process  The equalisation impact will be very limited. There is a risk of freezing the existing situation.  Staffing is not a good indicator of needs and the formula does not provide any mechanism for correcting under spending 2) Approach based on number of health workers This approach is very similar to the previous one. It substitute to salaries the number of health workers to avoid the problem of variable elements in salary compensation. There is no objective of equalization of the number of health workers. This will require the desegregation of the number of health workers into a few categories such as: general practitioners, specialized doctors, nurses, paramedics , etc. Strength of the approach:  The number of health worker is known and cannot be questioned  This is a better approach than the number of beds because beds can be unoccupied  This approach can be a good step in the direction of a heath financing formula or block grants Weakness of the approach:
  • 3.  This approach works well for the equalisation of non-wage expenditure but does not give a solution for the equalization of wage  The equalization impact is very limited 3) Approach based on capitation and case payments A number of countries use formulae that combine capitation with case payments. A health facility can be financed 60% by capitation and 40% by case payments. Strength of the approach:  It provides a strong incentive for increasing service outreach  The equalization impact remains strong Weakness of the approach:  This approach works well only when case payments are reimbursed according the diagnosis and treatment of the patients. It implies knowing precisely the cost of each treatment; something that does not appear feasible in Lao PDR.  The method requires a system able to check on the validity of the local data and the appropriateness of the services being delivered. Either it requires a large investment in it or a strong administrative structure. Without such system data can be easily manipulated and audit requirements will become costly and administratively demanding. 4) Approach based on needs and cost This is the simplest solution and the one that was envisaged when the Budget Norm Policy Framework was prepared. We start from a notional level of spending per capita that we adjust in every province to take into consideration needs and costs. For example: 20,000 kip per capita + 10% to 20% based on a need indicator + 5% to 25% based on a cost indicator. As in the previous approach, we ensure that a correct ratio wage/non-wage applies.  Suggested need indicators are life expectancy, infant mortality, nutrition, percentage of population under the poverty line, etc.  Suggested cost indicators are ethnic structure of the population, population density, altitude, etc. Strength of this approach  The equalization effect will be maximum  It meets all the requirements of the budget law and would get easily political support  The formula can ensure that sufficient funding is available for non-wage recurring expenditures
  • 4. Weakness of this approach  Suggested needs indicators (life expectancy, infant mortality) appear to be all questionable  The equalization effect might be too fast resulting in allocation of funds that cannot be properly used. The increase of the local budget should be limited over time or based on the submission of an implementation plan. 5) Approach based on cost of infrastructures and programmes This approach combines the two previous one. It distinguishes the cost of infrastructure from the cost of other programmes.  Infrastructure cost is calculated by “bed” with a minimum allocation by bed that includes salary cost and Goods & Services and by block grant for health centres. A substitute for beds could be the number of qualified doctors.  Like in the previous formula, the allocation to other programmes is calculated on the based of a minimum allocation per capita adjusted for cost and needs. However this time are calculated by programme on the basis of a 10% (or more) increase in their coverage. Strength of this approach:  This is the most equitable approach in terms of a balance between needs and costs  This approach solves the problem of insufficient funding for district hospital and health centres. District hospital could be financed by a block grant calculated on that basis.  It is consistent with programme budgeting which is the direction toward MoH wants to move Weakness of this approach  The formula become more complex  Experience shows that at the district level the bed occupancy rate is very low. One can question the financing of bed if they are not used  It might be difficult to distinguish between infrastructure cost (expenditure per bed) and other health services provided from the same health facilities. 6) Approach based on cost and service delivery This approach build on the previous one but includes some adjustments in order to take in consideration the quantitative aspect of services provided and to offer incentives for better use of facilities and more services provided.
  • 5. The cost of beds and other infrastructure is financed only to a certain level (between 60% and 80%). The difference is covered by a payment made on the basis of the number of patients treated (case payments). Other incentives are introduced in other programmes. In the case of Lao PDR we can include lump sum payments for each visit to a village in a priority district or even modulate the lump sum by village types. Strength of this approach:  It combines the advantages of the approach based on cost of infrastructure and programmes with a strong incentive to increase service delivery.  The system is fairer and avoids financing facilities which are not efficiently used. Weakness of this approach:  The formula can become too complex and difficult to calculate.  Data on use of services might be difficult to collect or manipulated. B. Conclusion of the formula selection Approach No 1 does not bring the equalization effect required and in fact exacerbate horizontal imbalance for non-wage expenditures. According to a test run with the macro fiscal model when wage expenditure fluctuate between 13,000 kips and 23,000 kips (if we exclude Vientiane Capital and Attapeu which are special cases), non wage expenditures fluctuate between 7% and 94% of wage expenditures. The conclusion that we should draw from the test is that we might consider limiting the capitation to non-wage expenditure. Equalization of salaries and compensation is impossible in the short term and should be considered as a long term goal that requires a proper mechanism. Approach No 2 is the one MoF’s Budget Department favors the more because it does not raise the issue of salaries and the equalization of wage expenditure. A formula limited to non-wage expenditures should take in consideration the staff structure of the health sector, the deployment of programmes in a given province, specific need factors and factors that affect cost of service delivery. Approach No 3 appears to be impracticable in Lao PDR. Approach 4 and 5 appear as good candidate for the interim formula if we accept that the final health financing formula should be developed over one or two years. A financing based on the number of beds does not appear as a good approach due to the very low occupancy rate. That leaves the number of qualified doctors as the only indicator of need.
  • 6. Approach 6 can be considered, but look more like a basis for a more elaborated health financing formula. So far the best approach seems to be Approach No 2 seen as a transition formula toward a Health Financing Formula developed on the basis of approach No 4 with a strong incentive component and a clear objective of increasing the utilisation of heath facilities. C. Analysis of cost drivers The main cost drivers in Lao PDR seem to be geography and population structure. Reaching minorities in high lands is more expensive than reaching Lao Loums in Mekong plain. Probably the best approach would be classifying provinces and districts in four or five broad categories associated with different cost levels based on some characteristics such percentage of minorities, percentage of urban population, population density, etc. D. Decisions that need to be made  We need to decide the scope of the financing formula. Certain health services might be excluded from the formula and financed by ad hoc grants. It might be the case of specialized hospitals. The formula should be linked to a health package available on a national basis.  At the moment it looks more likely that budget norms for the health sector will be introduced in different stages. The different stages could be (a) a formula for non-wage expenditure, (b) a formula for intergovernmental transfers giving an indication on the broas size of the general budget in the provinces, (c) a complete health financing formula  MoH needs to look at the process for rationalizing the number of health workers in provinces by developing staffing norms.  Do we take a full-fledge capitation approach based on a minimum spending per capita (approach 1 and 2) or do we want to disaggregate the formula in a number of service type?  Do we want to use the health financing formula to provide incentive for heath delivery? E. Conclusion and Recommendations Designing a complete health financing formula is a complex task that cannot be rushed. It can be done only when a number of health policy issues have been clarified such has the content of the health package, the new universal insurance scheme, user fee policy, incentive policy, and hospital management autonomy. We expect that these issues will be clarified within a year when a Health Policy Paper will be published as part of PRSO triggers. From the previous analysis we are able to make a few recommendations:  An interim budget norm formula applying for one or two budget cycles seems to be the best approach. A full-fledge health formula can de develop in parallel in one or two stages an introduced for the preparation of 2010/11 budget.
  • 7. The interim formula should prefigure the health financing formula in order to avoid any disruption.  Health facilities, activities and programmes outside the scope of the formula should be identified immediately and will be financed through ad hoc grants.  The selection of the formula should be based on its equalization effect and on its capacity to ensure that sufficient funding is available for non-wage recurring expenditures.  At this stage there is no guarantee that an increase in non-wage recurrent budget will cause a reduction of user fees. This objective can only be achieved if proper instructions are given to health facilities. Work on user fee policy and instructions (or regulation) should start in parallel with the design of the budget norm formula.  Additional components of the formula such as incentive, program financing desegregation and availability of funds at the district level will be reviewed in the next forth coming weeks and it will be decided if they become part of the interim formula or not.  If the option of an interim formula is chosen, it is important to create a dynamic with time constrains that will ensure that the final outcome (the complete heath financing formula) is not postponed indefinitely. Objectives of the health financing formula should be defined in the Health Policy Paper under preparation.  A satisfactory health financing formula requires better data than exist presently in Lao DPR. For that reason we believe that the health financing formula should de developed in several stages. Meanwhile other actions must be taken: o A database must be created for the systematic collection of health management data; o A statistical model for analysing spending variations amongst health facilities, programmes, provinces and districts must be developed ; o The Medium-Term Expenditure Framework (MTEF) must be completed; o The MTEF should be used to create a link between investment decisions and recurrent costs. No investment should be approved unless there is sufficient additional funding for its operation and maintenance. o A more detailed heath budget must be produced and consideration should be given to the introduction of programme budgeting; o The health budget should include user fees and user fees should be reflected in the national budget; o Accounting rules should be revised in order to provide better information on central/local expenditures, recurrent/investment expenditures and the used of donors’ funding. o A reporting mechanism on budget execution should be put in place between Provincial Health Offices and MoH. This reporting mechanism should provide data by district, by programme and by health facility o User fees should be fully reflected in health facilities’ accounting and proper regulation must ensure that user fees are always linked to a traceable service.
  • 8. o For the sake of reporting, transparency and effective public finance management, an agreement should be reached with the Treasury for they management through the Single Treasury Account while ensuring that the fund collected remain fully available at the local level. o In accordance with good public finance management practices, user fees should be included as resource of the Health Budget. F. Way forward In the first stage this paper will be used as a basis for discussion in an informal way. The objective will be to eliminate impracticable approaches, identified other possible options and refine the strategy. When a consensus will have emerged we might consider organizing a round table to reach a final decision.