Intervenant : Alois BACHMANN, Managing Partner, Human Resources & Building, swiss IT-Factory
2ème Atelier Microtechniques & Innovation de Minnovarc les 27-28 octobre 2011 à La Neuveville, Suisse.
3. A combined evolution…
With a solution created by practicing experts for expert practice
• 2009 MBO swiss IT-Factory
• 2007 / 2008 Implementation in Russia
• 2006 Result of merger of two largest Swiss construction companies
goes live with solution within 9 months
• 2005 Time Reporting + Calculation module
• 2004 Equipment planning and disposal module
• 2003 Tender functionality, GC + installation Tunnel Neat
• 2002 Start of development
• > 10 years experience in services and industry
3
4. … A proven ALL-IN-ONE solution
… swiss IT-Factory‘s CIT market solution portfolio raises the
transparency and efficiency bar to a unique new level. ...
Research Project concept/ General planner / Production Operation
Deconstruction
Investment Design Engineering General contractor Facility Mgmt.
Total contractor
Total solution provider (design & build)
GC
Acquisition Development Financing / Investment Sales
Development
GC
Acquisition Project calculation Project realisation Project completion
General Contractor
C&E
Tender Job
Acquisition / Acquisition Production Completion
preparation planning
Production
C&E
Maintenance Centre Procurement
Support
Commercial
Preparation / Technical Building
Building Management Building Services (IBM + IFM)
Maintenance Management
Management
Finance and Controlling, Corporate Services & Support, Human Resources, Mobile
4
5. Our advantageous approach
Our innovation cycle supports you in facing your challenge
target-performance customizing
analysis customer-specific
rough concept enhancements
detail concept customer-specific
additional
development
documentation
2nd level support
additional training
pilot
maintenance
migration
customer-specific
further roll out
development training
quality assurance go live
5
6. Project “Trenino”
Customer Objectives
Improve Security Increase Efficiency
Providing real time location Reduce unnecessary
of the workers inside the slowdown when the
tunnel connecting galleries are free
Provide a global overview Optimize the use of the
the driver of the current resources
situation: beyond human
eyes sight
Centralize control
6
7. Project “Trenino”
Implemented Solutions
Improve Security Increase Efficiency
Providing real time location Reduce unnecessary
of the workers inside the slowdown when the
tunnel connecting galleries are free
Provide a global overview Optimize the use of the
the driver of the current resources
situation: beyond human
eyes sight
Centralize control
7
9. … on a special environment …
Flat rail link through the Alps
9
10. … in the middle of the Alps.
SEDRUN – Heart piece of the NEW TRANSALPINE LINE
10
11. Objectives
Mandatory informations on Trenino-Dashboard & Control Center
1. PERSON (Mine workers) identification and localisation (section)
2. TRAIN identification and localisation
3. EQUIPMENT identification and localisation (Drilling, Dredge, Dumper, etc.)
4. TRACK SWITCHER status and remote control
11
12. Objectives - Scheme
Scenario No.1
Tracking based on sectors
Section xn Section x1 Section x2 Section x3 Section x4 Section xn
No speed limit Speed reduction Speed limit / Look out No speed limit
Km Km Km Km
12,025 12,350 12,675 13,000
Actual position
Km 11,985
Section x1
No speed limit
Km/h
30 30
20
10
Actual speed Speed instruction
(Person or equipment ahead)
12
13. Objectives - Scheme
Scenario No.1
Tracking based on sectors
Section xn Section x1 Section x2 Section x3 Section x4 Section xn
No speed limit Speed reduction Speed limit / Look out No speed limit
Km Km Km Km
12,025 12,350 12,675 13,000
Actual position
Km 11,985
Section x1
No speed limit
Km/h
30 30
20
10
Actual speed Speed instruction
(Person or equipment ahead)
13
18. Project “Rocon”
Increasing efficiency and avoid additional investment
• To transport concret for final construction the questions was:
Buy new wagons or optimize concret transportation with existing ones
• New investment for wagons (around 1’400’000 CHF ) was not necesary
because…
• …existing security system can be used for traking positions of «Rocon» train
and optimize the process
18
22. Project “Equipment Monitoring”
Equipment monitoring system
• Where are the main equipments in use?
• Trigger event while equipment passes observed sectors
• Preventive stealing
22