Reshaping the Data Center
Tendances Technologies

Mohamed SAAD, CISA, PMP, ITIL, ISO 27 001 LA
1
Sommaire
Pourquoi un tel sujet ?

Quelques bads stories en image

Reshaping the Data Center: Le Projet

Data Center et Green IT

2
Sommaire
Pourquoi un tel sujet ?

Quelques bads stories en image

Reshaping the Data Center: Le Projet

Data Center et Green IT

3
Gartner Top 10 Strategic Areas
Top 10 Strategic Tech Areas for 2009 Top 10 Strategic Tech Areas for 2010
1. Virtualization
2. Business Intelligence
3. Cloud Computing
4. Green IT
5. Unified Communication
6. Social SW and Social Networking
7. Web Oriented Architecture
8. Enterprise Mashups
9. Specialized systems
10. Servers – beyond Blades

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Cloud Computing
Advanced analytics
Client Computing
Green IT
Reshaping the Data Center
Social Computing
Security – Activity Monitoring
Flash memory
Virtualization
Mobile Applications

4
Reshaping the Data Center, Mohamed SAAD
Les Data Center
Main DC et DRS
Pourquoi un tel sujet ?
• Une des préoccupations majeures des DSI / Risk Management
• Considéré comme un des risques opérationnels les plus
importants (Bâle II, ISO 27 000…)

• Un des investissements les plus importants:
– Budget: 6 MMdhs ~ 100 MMdhs

5
Reshaping the Data Center, Mohamed SAAD
Les Data Center
Main DC et DRS
Pourquoi un tel sujet ?
• Mais surtout: Parce que l’on revient à l’Informatique Centralisée !
Période

Variable dominante

50’s – 60’s

HW

70’s – mi 80’s

SW

90’s

Les années 2000

SW
Qualité de Sce
Sécurité
SW
Qualité
Sécurité
Continuité
Réduction des coûts
6

Reshaping the Data Center, Mohamed SAAD
Les Data Center
Main DC et DRS
Pourquoi un tel sujet ? Mais aussi…
• Intempéries de Casablanca du 30 Novembre:
– Des centaines d’entreprises privées du courant électrique pendant 48h
– 50% du réseau bancaire de Casablanca non opérationnel
– BMCI groupe BNP Paribas non opérationnel
– 30 % du Marché des Capitaux non opérationnel
– L’oued Bouskoura qui traverse Casablanca a englouti plusieurs sièges
d’Etses, Ecoles, routes…
– Ailleurs, On a connu Pire: Cyclone Katrina, World TC…
7
Reshaping the Data Center, Mohamed SAAD
Evolution de l’Infrastructure
Le pendule des Architectures Informatiques

Autonomie de
l’utilisateur:
• Infocentre /
datawarehouse/
datamining…
• Développements
locaux
• Partage de données
• Sauvegarde non
contrôlée
• OS peu fiables…

Informatique
centralisée:
• Salle machine unique
• Gros système
• Utilisateurs accédant à
travers des terminaux
• Les supports de
stockage sont
centralisés…

Années 50, 60, 70
Reshaping the Data Center, Mohamed SAAD

Démocratisation de
l’informatique:
• Utilisateurs connectés au
sites/serveurs
• PCs
• Avènement du Client/serveur
• …Années 80

Années 90

8
Evolution de l’Infrastructure
Le pendule des Architectures Informatiques

 Sécurité

 Sécurité
Informatique
centralisée:
• Maîtrise des
plateformes
• Centralisation de
l’information
• Contrôle de
l’infrastructure
• Maîtrise et
centralisation des
sauvegardes /
Performances / fiabilités
des supports / machines
• Baies de stockage
• Backups / PCA / sites
secours
• Normes, BP, Standards…

Ces 10 dernières années
Reshaping the Data Center, Mohamed SAAD

Autonomie de
l’utilisateur:
• Infocentre /
datawarehouse/
datamining…
• Développements
locaux
• Partage de données
• Sauvegarde non
contrôlée
• OS peu fiables…

Démocratisation de
l’informatique:
• Utilisateurs connectés
au sites/serveurs
• PCs
• Avènement du
Client/serveur
•…

Années 90

9
Sommaire
Pourquoi un tel sujet ?

Quelques bads stories en image

Reshaping the Data Center: Le Projet

Data Center et Green IT

10
Reshaping the Data Center, Mohamed SAAD
Data Center
Malheureusement, quelques bad stories…

11
Reshaping the Data Center, Mohamed SAAD
Data Center
Malheureusement, quelques bad stories…

12
Reshaping the Data Center, Mohamed SAAD
Data Center
Malheureusement, quelques bad stories…

13
Reshaping the Data Center, Mohamed SAAD
Data Center
Malheureusement, quelques bad stories…

14
Reshaping the Data Center, Mohamed SAAD
Data Center
Malheureusement, quelques bad stories…

15
Reshaping the Data Center, Mohamed SAAD
Data Center
Malheureusement, quelques bad stories…

16
Reshaping the Data Center, Mohamed SAAD
Sommaire
Pourquoi un tel sujet ?

Quelques bads stories en image

Reshaping the Data Center: Le Projet

Data Center et Green IT

17
Reshaping the Data Center, Mohamed SAAD
Data Center
Les étapes du projet
1. Considérer ce chantier comme étant UN PROJET

2. Et l’inscrite dans le cadre du PCA
3. Audit des lieux

4. Projection des acquisitions sur les 10 prochaines années
5. Rédaction des spécifications (ANSI/TIA-942-2005)
6. Dérouler les étapes classiques d’une bonne gestion de
projet
18
Reshaping the Data Center, Mohamed SAAD
Data Center
Les étapes du projet
• Les parties prenantes du projet:
–
–
–
–
–

Représentant de la DSI
Représentant de la DRM
Représentant de la Direction Achat (et Sces généraux)
Le prestataire externe (MOE)
Et un Bureau de contrôle

• Facteurs clés de succès:
– Faire un audit des lieux
– Établir un cahier des charges par des experts en la
matière
– Se faire accompagner par un bureau de contrôle
19
Reshaping the Data Center, Mohamed SAAD
Data Center
Les étapes du projet
• Projection des acquisitions sur les 10
prochaines années:
– Équipements HW (Serveurs, baies, éléments
actifs, câblage…)
– Calcul des besoins:
•
•
•
•
•

Consommation électrique
Besoin en climatisation / Ventilation
Accès aux équipements
Eclairage
…
20

Reshaping the Data Center, Mohamed SAAD
Data Center
Conception
• Cahier des Spécifications:
– Emplacement
– Accès
– Conception architecturale

21
Reshaping the Data Center, Mohamed SAAD
Data Center
Les smart shelter
•

AV1: Résistance au feu 120 min

•

AV2: Stabilité thermale

•

AV3: 2 types de structure:
• Room in a Room
• Self Standing room

•

AV4: Modulable

•

AV5: Waterproof

•

AV6: Surface traitée
• Minimise l’accumulation de la poussière
• Néttoyage simple

•
•

AV7: Toutes les ouvertures sont hermétiques
…
22

Reshaping the Data Center, Mohamed SAAD
Data Center
Accès cablâge

23
Reshaping the Data Center, Mohamed SAAD
Data Center
Faux Plancher et Porte coupe feu
• Revêtement Linoleum / Aluminium
• Min. Haut: 200 mm
• Résistance de charge > 1000 Kg/m²
• Rampe / marche d’accès
• Porte format 90 L / 120 L

24
Reshaping the Data Center, Mohamed SAAD
Data Center
Installation électrique
•
•
•
•
•
•
•
•

Panneau de distribution autonome
Mise à la terre
Evaluation de la charge
Alimentation redondante
Audit périodique
UPS – Générateur
…
EN 61008-1, EN 61009-1,
EN 60730-2-7, ...etc.
25

Reshaping the Data Center, Mohamed SAAD
Data Center
Air Conditionné
• Dimensionnement
• Enérgie dissipée
• Tendance future

• Distribution de l’air conditionnée:
– Courant d’air froid / chaud

26
Data Center
Les Systèmes de câblage des DATA CENTER
• Les chemins de câblage:
–
–
–
–
–
–
–
–

Equipements de Switching
Gestion des connections
Connections Clavier / Vidéo/Souris (KVM)
Connections données
LAN
WAN
SAN (Stotage Area Networks)
Autres systèmes de signalisation (feu, sécurité,
électrique…)

• Distances de câblage horizontales
27
Reshaping the Data Center, Mohamed SAAD
Data Center
CABLING PATHWAYS
• Les chemins de cables doivent être conforme
à la norme ANSI/TIA-569-B
• Séparation des câbles électriques et Telecom

28
Reshaping the Data Center, Mohamed SAAD
Data Center
Systèmes d’accès
• Contrôle d’accès:
– Par Carte
– Par code; ou Code + Carte
– Biométrique:





Basé sur le « Something we are », est le moyen d’I&A
Demande un équipement de reconnaissance de la caractéristique
biométrique
La performance de l’équipement de contrôle est basée sur 3 mesures:




FRR (False Rejection Rate):
 Un individu autorisé est rejeté
FAR (False accceptance Rate):







Un individu non autorisé est accépté

EER (Equal Error Rate):

 Est le pourcentage ou le EER = FAR
Le meilleur équipement de biométrie est celui ayant le plus petit EER
29

Reshaping the Data Center, Mohamed SAAD
Data Center
Systèmes d’accès
• Biométrie:
–
–
–
–
–
–

La palme de la main (EER = 0 %)
La géométrie de la main (EER = 0.1 %)
L’iris (EER = 0.5 %)
La rétine (EER = 1.5 %)
L’empreinte (EER = 5 %)
La face (EER > 5 %)

30
Reshaping the Data Center, Mohamed SAAD
Data Center
Redondance DATA CENTER

31
Reshaping the Data Center, Mohamed SAAD
Sommaire
Pourquoi un tel sujet ?

Quelques bads stories en image

Reshaping the Data Center: Le Projet

Data Center et Green IT

32
Reshaping the Data Center, Mohamed SAAD
Data Center
Quelques constats
• Le coût total de consommation d’électricité d’un rack
de serveurs est d’environ 17 000 $/an !
• Le Green IT fait des Data Centers un des axes majeurs
de réduction de coûts

Source : Etude Emerson "Energy Logic : Reducing Data Center Energy
Consumption by Creating Savings that Cascade Across Systems"

Reshaping the Data Center, Mohamed SAAD

33
Data Center
Quelques bonnes pratiques (1/2)
• 1 Watt économisé au niveau d’un serveur se traduit par 2,84 Watts
économisés à l’échelle du centre de données. C’est ce que l’on appelle
l’effet de cascade.
• Mettre hors tension les serveurs inutiles : Selon une enquête de Kelton
Research publiée le 16 octobre 2009, au moins 15% des serveurs allumés
en Datacentre ne serviraient à rien.

• Éteindre ou mettre en veille les serveurs inactifs : Cela peut par exemple
être le cas des serveurs de calcul qui ne nécessitent pas d’être disponible
24h/24 7j/7
• Virtualiser les serveurs (dans la mesure du possible) : La virtualisation
permet de consolider au sein d’un même serveur physique, plusieurs
serveurs virtualisé (logique)

34
Reshaping the Data Center, Mohamed SAAD
Data Center
Quelques bonnes pratiques (2/2)
A l’Achat…
• Acheter du matériel eco-labellisé : De nombreux écolabels existent pour
le matériel informatique
• Acheter du matériel avec des spécifications en température et taux
d’humidité souples : (ETSI EN 300 019-1-3).
• Acheter des logiciels efficients : Intégrer le critère de la consommation
des ressources dans le processus de sélection des logiciels.
• Refroidir juste ou il faut
• Amener le froid au plus près des sources chaudes
• Séparer au maximum les flux d’air froid des flux d’air chaud
• Isoler les allées froides des allées chaudes
• Les experts recommandent aujourd’hui une température aux alentours
de 27°C (80°F)

35
Reshaping the Data Center, Mohamed SAAD
Quelques référentiels
• Documents fournis:
– Code of Conduct on Data Centres Energy Efficiency, V1.0, European
commission
– Best Practices, for the EU Code of Conduct on Data Centres
– Spécifcations:
• Etapes à suivre (Doc Excel)
• Telecommunication Infra Standards for DC (ANSI/TIA-942)

36
Reshaping the Data Center, Mohamed SAAD
Merci

37
Reshaping the Data Center, Mohamed SAAD

Reshaping the data center v5

  • 1.
    Reshaping the DataCenter Tendances Technologies Mohamed SAAD, CISA, PMP, ITIL, ISO 27 001 LA 1
  • 2.
    Sommaire Pourquoi un telsujet ? Quelques bads stories en image Reshaping the Data Center: Le Projet Data Center et Green IT 2
  • 3.
    Sommaire Pourquoi un telsujet ? Quelques bads stories en image Reshaping the Data Center: Le Projet Data Center et Green IT 3
  • 4.
    Gartner Top 10Strategic Areas Top 10 Strategic Tech Areas for 2009 Top 10 Strategic Tech Areas for 2010 1. Virtualization 2. Business Intelligence 3. Cloud Computing 4. Green IT 5. Unified Communication 6. Social SW and Social Networking 7. Web Oriented Architecture 8. Enterprise Mashups 9. Specialized systems 10. Servers – beyond Blades 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Cloud Computing Advanced analytics Client Computing Green IT Reshaping the Data Center Social Computing Security – Activity Monitoring Flash memory Virtualization Mobile Applications 4 Reshaping the Data Center, Mohamed SAAD
  • 5.
    Les Data Center MainDC et DRS Pourquoi un tel sujet ? • Une des préoccupations majeures des DSI / Risk Management • Considéré comme un des risques opérationnels les plus importants (Bâle II, ISO 27 000…) • Un des investissements les plus importants: – Budget: 6 MMdhs ~ 100 MMdhs 5 Reshaping the Data Center, Mohamed SAAD
  • 6.
    Les Data Center MainDC et DRS Pourquoi un tel sujet ? • Mais surtout: Parce que l’on revient à l’Informatique Centralisée ! Période Variable dominante 50’s – 60’s HW 70’s – mi 80’s SW 90’s Les années 2000 SW Qualité de Sce Sécurité SW Qualité Sécurité Continuité Réduction des coûts 6 Reshaping the Data Center, Mohamed SAAD
  • 7.
    Les Data Center MainDC et DRS Pourquoi un tel sujet ? Mais aussi… • Intempéries de Casablanca du 30 Novembre: – Des centaines d’entreprises privées du courant électrique pendant 48h – 50% du réseau bancaire de Casablanca non opérationnel – BMCI groupe BNP Paribas non opérationnel – 30 % du Marché des Capitaux non opérationnel – L’oued Bouskoura qui traverse Casablanca a englouti plusieurs sièges d’Etses, Ecoles, routes… – Ailleurs, On a connu Pire: Cyclone Katrina, World TC… 7 Reshaping the Data Center, Mohamed SAAD
  • 8.
    Evolution de l’Infrastructure Lependule des Architectures Informatiques Autonomie de l’utilisateur: • Infocentre / datawarehouse/ datamining… • Développements locaux • Partage de données • Sauvegarde non contrôlée • OS peu fiables… Informatique centralisée: • Salle machine unique • Gros système • Utilisateurs accédant à travers des terminaux • Les supports de stockage sont centralisés… Années 50, 60, 70 Reshaping the Data Center, Mohamed SAAD Démocratisation de l’informatique: • Utilisateurs connectés au sites/serveurs • PCs • Avènement du Client/serveur • …Années 80 Années 90 8
  • 9.
    Evolution de l’Infrastructure Lependule des Architectures Informatiques  Sécurité  Sécurité Informatique centralisée: • Maîtrise des plateformes • Centralisation de l’information • Contrôle de l’infrastructure • Maîtrise et centralisation des sauvegardes / Performances / fiabilités des supports / machines • Baies de stockage • Backups / PCA / sites secours • Normes, BP, Standards… Ces 10 dernières années Reshaping the Data Center, Mohamed SAAD Autonomie de l’utilisateur: • Infocentre / datawarehouse/ datamining… • Développements locaux • Partage de données • Sauvegarde non contrôlée • OS peu fiables… Démocratisation de l’informatique: • Utilisateurs connectés au sites/serveurs • PCs • Avènement du Client/serveur •… Années 90 9
  • 10.
    Sommaire Pourquoi un telsujet ? Quelques bads stories en image Reshaping the Data Center: Le Projet Data Center et Green IT 10 Reshaping the Data Center, Mohamed SAAD
  • 11.
    Data Center Malheureusement, quelquesbad stories… 11 Reshaping the Data Center, Mohamed SAAD
  • 12.
    Data Center Malheureusement, quelquesbad stories… 12 Reshaping the Data Center, Mohamed SAAD
  • 13.
    Data Center Malheureusement, quelquesbad stories… 13 Reshaping the Data Center, Mohamed SAAD
  • 14.
    Data Center Malheureusement, quelquesbad stories… 14 Reshaping the Data Center, Mohamed SAAD
  • 15.
    Data Center Malheureusement, quelquesbad stories… 15 Reshaping the Data Center, Mohamed SAAD
  • 16.
    Data Center Malheureusement, quelquesbad stories… 16 Reshaping the Data Center, Mohamed SAAD
  • 17.
    Sommaire Pourquoi un telsujet ? Quelques bads stories en image Reshaping the Data Center: Le Projet Data Center et Green IT 17 Reshaping the Data Center, Mohamed SAAD
  • 18.
    Data Center Les étapesdu projet 1. Considérer ce chantier comme étant UN PROJET 2. Et l’inscrite dans le cadre du PCA 3. Audit des lieux 4. Projection des acquisitions sur les 10 prochaines années 5. Rédaction des spécifications (ANSI/TIA-942-2005) 6. Dérouler les étapes classiques d’une bonne gestion de projet 18 Reshaping the Data Center, Mohamed SAAD
  • 19.
    Data Center Les étapesdu projet • Les parties prenantes du projet: – – – – – Représentant de la DSI Représentant de la DRM Représentant de la Direction Achat (et Sces généraux) Le prestataire externe (MOE) Et un Bureau de contrôle • Facteurs clés de succès: – Faire un audit des lieux – Établir un cahier des charges par des experts en la matière – Se faire accompagner par un bureau de contrôle 19 Reshaping the Data Center, Mohamed SAAD
  • 20.
    Data Center Les étapesdu projet • Projection des acquisitions sur les 10 prochaines années: – Équipements HW (Serveurs, baies, éléments actifs, câblage…) – Calcul des besoins: • • • • • Consommation électrique Besoin en climatisation / Ventilation Accès aux équipements Eclairage … 20 Reshaping the Data Center, Mohamed SAAD
  • 21.
    Data Center Conception • Cahierdes Spécifications: – Emplacement – Accès – Conception architecturale 21 Reshaping the Data Center, Mohamed SAAD
  • 22.
    Data Center Les smartshelter • AV1: Résistance au feu 120 min • AV2: Stabilité thermale • AV3: 2 types de structure: • Room in a Room • Self Standing room • AV4: Modulable • AV5: Waterproof • AV6: Surface traitée • Minimise l’accumulation de la poussière • Néttoyage simple • • AV7: Toutes les ouvertures sont hermétiques … 22 Reshaping the Data Center, Mohamed SAAD
  • 23.
    Data Center Accès cablâge 23 Reshapingthe Data Center, Mohamed SAAD
  • 24.
    Data Center Faux Plancheret Porte coupe feu • Revêtement Linoleum / Aluminium • Min. Haut: 200 mm • Résistance de charge > 1000 Kg/m² • Rampe / marche d’accès • Porte format 90 L / 120 L 24 Reshaping the Data Center, Mohamed SAAD
  • 25.
    Data Center Installation électrique • • • • • • • • Panneaude distribution autonome Mise à la terre Evaluation de la charge Alimentation redondante Audit périodique UPS – Générateur … EN 61008-1, EN 61009-1, EN 60730-2-7, ...etc. 25 Reshaping the Data Center, Mohamed SAAD
  • 26.
    Data Center Air Conditionné •Dimensionnement • Enérgie dissipée • Tendance future • Distribution de l’air conditionnée: – Courant d’air froid / chaud 26
  • 27.
    Data Center Les Systèmesde câblage des DATA CENTER • Les chemins de câblage: – – – – – – – – Equipements de Switching Gestion des connections Connections Clavier / Vidéo/Souris (KVM) Connections données LAN WAN SAN (Stotage Area Networks) Autres systèmes de signalisation (feu, sécurité, électrique…) • Distances de câblage horizontales 27 Reshaping the Data Center, Mohamed SAAD
  • 28.
    Data Center CABLING PATHWAYS •Les chemins de cables doivent être conforme à la norme ANSI/TIA-569-B • Séparation des câbles électriques et Telecom 28 Reshaping the Data Center, Mohamed SAAD
  • 29.
    Data Center Systèmes d’accès •Contrôle d’accès: – Par Carte – Par code; ou Code + Carte – Biométrique:    Basé sur le « Something we are », est le moyen d’I&A Demande un équipement de reconnaissance de la caractéristique biométrique La performance de l’équipement de contrôle est basée sur 3 mesures:   FRR (False Rejection Rate):  Un individu autorisé est rejeté FAR (False accceptance Rate):    Un individu non autorisé est accépté EER (Equal Error Rate):  Est le pourcentage ou le EER = FAR Le meilleur équipement de biométrie est celui ayant le plus petit EER 29 Reshaping the Data Center, Mohamed SAAD
  • 30.
    Data Center Systèmes d’accès •Biométrie: – – – – – – La palme de la main (EER = 0 %) La géométrie de la main (EER = 0.1 %) L’iris (EER = 0.5 %) La rétine (EER = 1.5 %) L’empreinte (EER = 5 %) La face (EER > 5 %) 30 Reshaping the Data Center, Mohamed SAAD
  • 31.
    Data Center Redondance DATACENTER 31 Reshaping the Data Center, Mohamed SAAD
  • 32.
    Sommaire Pourquoi un telsujet ? Quelques bads stories en image Reshaping the Data Center: Le Projet Data Center et Green IT 32 Reshaping the Data Center, Mohamed SAAD
  • 33.
    Data Center Quelques constats •Le coût total de consommation d’électricité d’un rack de serveurs est d’environ 17 000 $/an ! • Le Green IT fait des Data Centers un des axes majeurs de réduction de coûts Source : Etude Emerson "Energy Logic : Reducing Data Center Energy Consumption by Creating Savings that Cascade Across Systems" Reshaping the Data Center, Mohamed SAAD 33
  • 34.
    Data Center Quelques bonnespratiques (1/2) • 1 Watt économisé au niveau d’un serveur se traduit par 2,84 Watts économisés à l’échelle du centre de données. C’est ce que l’on appelle l’effet de cascade. • Mettre hors tension les serveurs inutiles : Selon une enquête de Kelton Research publiée le 16 octobre 2009, au moins 15% des serveurs allumés en Datacentre ne serviraient à rien. • Éteindre ou mettre en veille les serveurs inactifs : Cela peut par exemple être le cas des serveurs de calcul qui ne nécessitent pas d’être disponible 24h/24 7j/7 • Virtualiser les serveurs (dans la mesure du possible) : La virtualisation permet de consolider au sein d’un même serveur physique, plusieurs serveurs virtualisé (logique) 34 Reshaping the Data Center, Mohamed SAAD
  • 35.
    Data Center Quelques bonnespratiques (2/2) A l’Achat… • Acheter du matériel eco-labellisé : De nombreux écolabels existent pour le matériel informatique • Acheter du matériel avec des spécifications en température et taux d’humidité souples : (ETSI EN 300 019-1-3). • Acheter des logiciels efficients : Intégrer le critère de la consommation des ressources dans le processus de sélection des logiciels. • Refroidir juste ou il faut • Amener le froid au plus près des sources chaudes • Séparer au maximum les flux d’air froid des flux d’air chaud • Isoler les allées froides des allées chaudes • Les experts recommandent aujourd’hui une température aux alentours de 27°C (80°F) 35 Reshaping the Data Center, Mohamed SAAD
  • 36.
    Quelques référentiels • Documentsfournis: – Code of Conduct on Data Centres Energy Efficiency, V1.0, European commission – Best Practices, for the EU Code of Conduct on Data Centres – Spécifcations: • Etapes à suivre (Doc Excel) • Telecommunication Infra Standards for DC (ANSI/TIA-942) 36 Reshaping the Data Center, Mohamed SAAD
  • 37.
    Merci 37 Reshaping the DataCenter, Mohamed SAAD