SlideShare une entreprise Scribd logo
www.thalesgroup.com Thales Copyright 2018
LE ‘TAKT THINKING’
POUR TRANSFORMER L’ENTREPRISE
LEAN SUMMIT 2018, Lyon
Norbert Dubost, VP Operations & Industrie, THALES
Microwave & Imaging Sub-Systems (MIS)
2 Thales Copyright 2018
Quelques mots sur mon parcours …VP Operations & Industrie, THALES
Microwave & Imaging Sub-Systems (MIS)
1981
THOMSON CSF  THALES
2006
Rencontre avec le Lean
2010
Plongée sur le Gemba
3 Thales Copyright 2018
La relation au temps d’une grande entreprise issue historiquement du
monde de la Défense
4 Thales Copyright 2018
Ma relation avec le temps …
RÉUNION
de 2H
repoussée
La JOURNÉE la plus EFFICACE : le
jour du départ en vacances
19h03, Vendôme – Paris …
5 Thales Copyright 2018
Ma découverte du ‘Takt Thinking’ : AOA Vendôme (Angle of Attack)
Fin 2014 : X12 les quantités livrés
3 sondes / jour  36 / jour en 6 mois !
Le TAKT THINKING MODIFIE PUISSAMMENT LE RAISONNEMENT INDUSTRIEL
÷ 12
Contenu de travail au poste, réactivité
aux problèmes, intervalle de livraison,
temps de formation,…
X 12 tous les moyens,
postes de travail, surface,…
6 Thales Copyright 2018
THALES Microwave & Imaging Sub-Systems (MIS)
7 Thales Copyright 2018
Chiffres-clés Microwave & Imaging Sub-Systems (MIS)
2 000
Références de produits
36000 produits livrés :
Takt-Time = 2m30s
100 000 m2
de surface
dont 10 000 m2
de salles blanches
619
brevets
industriels
en validité
11
bureaux
commerciaux
dans le monde
2 761
collaborateurs
1 000
CLIENTS
7 SITES Industriels
(Vélizy, Thonon, Moirans X2,
Ulm, Yoqneam, Shanghai)
538 M€
CA 2017
10% consacrés à la R&D
€
CA
BELLE TECHNOLOGIE, BELLE POSITION SUR LES MARCHÉS,
MAIS D’IMPORTANTES DIFFICULTÉS INDUSTRIELLES (RETARDS, RETOURS CLIENT, COÛTS DE PRODUCTION, …)
8 Thales Copyright 2018
Contexte Produit  Production
Est-ce que vous
savez combien le
client en veux ?
1. Approvisionnement de matières et de
pièces élémentaires
2. Contrôle et traitements
thermochimiques des pièces
élémentaires achetées et/ou
fabriquées en interne
3. Fabrication des sous-ensembles de
premier niveau (usinage, brasage,
dépôt, métallisation…)
4. Assemblage des sous-ensembles tube
en milieu propre (de 100 à 150 pièces
par tube)
5. Fermeture des tubes
6. Etuvage/Pompage
1. Pré-habillage
2. Préréglage
3. Durcissage
4. Réglage final
5. Habillage tube durci
6. Déverminage
7. Sélection modèle de vol
8. Inspection client
9. Habillage tube déverminé
10. Recette Hyper-fréquence initiale
11. Recette Mécanique
12. Recette Vide Thermique
13. Recette Hyper-fréquence finale
14. Certificat de conformité
15. Acceptation client
16. Expédition
AVALAMONT
Non ?!
Le client a besoin
d’une pièce toutes
les 1h45
Je ne
travaille
pas assez
?!
Que pouvons-nous
faire pour livrer une
pièce toutes les
1h45 ?
Un plan
d’action
de mon
chef ?
Que pouvons-nous
faire pour livrer une
pièce toutes les
1h45 ?
Ah, vous
voulez
vraiment
cela ! J’ai
plein
d’idées !
9 Thales Copyright 2018
Comment attraper le sujet de la transformation en PROFONDEUR mais RAPIDE
▌ Par le Gemba évidement
▌ Par la Qualité et l’Arrêt au 1er défaut bien
entendu
▌ …
MAIS besoin d’une implication forte et
rapide des « têtes »
▌ le ‘Takt-Time Thinking’ : le meilleur de
chacun au BON MOMENT
UN ACCÉLÉRATEUR DE TRANSFORMATION LEAN : REVOIR LA RELATION AU TEMPS LONG
10 Thales Copyright 2018
Temps LONG VS Temps COURT
QUARANTAINE
POUR « CAPITALISER »
Qualification Produit/Process
CAPITALISATION
SPC sous PC
COMMISSIONS MOD
Raisonnement à
capacité infinie
KPI &
Reporting mensuel
MYB (Budget)
REVUES MENSUELLES
Process achat
multi-signatures
8D
Une horloge dans mon bureau
et dans tous les ateliers
Les petits trains 1 X 1 heure (cf 19h03)
0 QUARANTAINE
LA MODIFICATION
DES DOSSIERS EN 24H
L’ANDON : OBLIGATION AU CHEF
D’INTERVENIR IMMÉDIATEMENT
Les sms en fin de
journée pour montrer
l’intérêt du manager
Salle boussole avec KPI hedbo
Topo
techniqu
e/qualité
chaque
matin
STOP & FIX
11 Thales Copyright 2018
L’introduction des Kanban, pour craquer l’influence du MRP2
KANBAN, AFFICHER « SANS MENTIR » LES BESOINS CLIENT DU MOMENT
12 Thales Copyright 2018
Le dans la ‘tête’ de TOUS: la Takt TimeTable
Céramique EMBALLAGE Emballage Emballage Packaging Packing
Hélice ESSAIS_TOP Goulot n°1 Finition Essais (3C) Acceptance Tests Final inspection
Montant HAB_TOP Essais Habillage Goulot n°1 Prefoc/Foc/PBI/BI Test
Canons / Cathodes Goulot n°1 POMPAGE_TOP Intégration Prépotting Housing Integration
Sous ensemble Wenhelt MONTAGE_TOP Goulot n°3 Flexage Essais (2C) Goulot n°3 Pumping Picking
Ensemble Cathode Wenhelt ESSAIS_GAC Front-end Pompage Final assembly
Collecteurs MONTAGE_GAC Composants Goulot n1 Montage tube nu Guns Goulot n°2
Ligne SPACE Goulot n°2 ESSAIS_CUIVRE_CER Pavés Lines
Tubes fermés SPACE MONTAGE_CUIVRE_CER Goulot n°2 Enceintes équipées Brasing
Tubes pompés SPACE HAB_ESSAIS_IND Pieds de verre Turning of brased assembly Goulot n°3
TPR Préhabillage FINITION_IND Fenetres Metallisation
Démarrage essai SPA Ka POMPAGE_IND Ecrans secondaires Chemical treatment
Démarrage essai SPA Ku-Bande X ASSEMBLAGE_IND Ecrans primaires Goulot n°2 Mecanique
Durcissage PA MADC Monoblocs Wire processing
Réglage Ka REGDURCI PYRO Traitement thermique Cathods manufacturing
Réglage Ku - X REGDURCI CHIMIE3 Caméras Supply of Velizy Goulot n°1
Habillage tube durci GRILLES Alimentations
Mesures TDV0 Ka CATHODES
Mesures TDV0 Ku - X BRASAGE TETE INDUSTRIEL
Déverminage BRASAGE ANODES IND
Mesures auto MECA_CN42
Sélection MECA_TRAUB
Préparation mise en capot GT27 SP
DATA Goulot n°3 CHIMIE
Habillage tube déverminé CONTRÔLE D'ENTREE
Recette initiale AUTO
Vibration
Vide thermique
Recette finale AUTO
Recette manuelle
Nettoyage
Contrôle Final
Emballage
EM tube PF spatial
Atelier Tubes Pompés
Atelier Salle Montage DEFSI
Habillage - Essais DEFSI (EM tube PF)
Contrôle sortie (CQP)
Contrôle d'entrée
Magasin
DEFSI 4,4H / 2,3H 13 min / 9 min 28 min / 34 min 15 min / 12 min PAC3 3,5H / 3,5H 2,5H/2H
SPACE 3,5H / 4,5H TL 11H / 6H
Space TH 5H / 2H
TAKT-TIME Sites CCI - SEMAINE 12
VELIZY THONON TRIXELL CPL / DPL ULM CMT
AmontSpatialAMONTSpatialAVALDEFSICOMMUN
TAKT-TIME DE LA SEMAINE VS TAKT-TIME DSP
Principes :
o TAKT-Time Hebdomadaire par chef d’atelier
o Goulot n°1 => Immersion du Directeur Industriel en atelier
pour « fixer » le problème
o Solidarité inter-ateliers
o Recherche systématique de ‘Plans B’
o …
TAKT-TIME affichés en atelier
13 Thales Copyright 2018
Des résultats en 20 mois
IMPLICATION DES GENS
Suggestions : de 0 à 900 Absentéisme : -16%
RETARDS DIVISÉS
PAR 3
RETOURS CLIENTS DIVISÉS PAR 2
COÛTS DE NON QUALITÉ : -12 M€
14 Thales Copyright 2018
Conclusion
LE TAKT THINKING  DONNER LE MEILLEUR DE SOI-MÊME À CHAQUE INSTANT
pour
les clients
pour
soi
pour changer l’entreprise : passer du 4D au 4F
 Defining what the problem is
 Deciding which option is best
 Driving people to implement it through an
action plan
 Dealing with consequences
 Find the right problems in real life, on the
gemba
 Face the main challenges once the easy
stuff has been cleared away
 Frame them in a way that is
understandable by everyone
 Form new unexpected solutions through
constant experimenting & learning
15 Thales Copyright 2018
Merci de votre attention

Contenu connexe

Similaire à Le "takt thinking" pour transformer l'entreprise par Norbert Dubost de Thales

MIPE : Christelle Fenayon, Lean Tour TOURS, Nov.17
MIPE : Christelle Fenayon, Lean Tour TOURS, Nov.17MIPE : Christelle Fenayon, Lean Tour TOURS, Nov.17
MIPE : Christelle Fenayon, Lean Tour TOURS, Nov.17
Institut Lean France
 
Jeu de la maintenance stratégie
Jeu de la maintenance stratégieJeu de la maintenance stratégie
Jeu de la maintenance stratégieCIPE
 
mon exposé fin d'etudes
mon exposé fin d'etudesmon exposé fin d'etudes
mon exposé fin d'etudesFiras Hajri
 
COURS DE PRODUCTIONsdsdssdsds - Jad SMIDI.pdf
COURS DE PRODUCTIONsdsdssdsds - Jad SMIDI.pdfCOURS DE PRODUCTIONsdsdssdsds - Jad SMIDI.pdf
COURS DE PRODUCTIONsdsdssdsds - Jad SMIDI.pdf
AbderrahmaneBenErajr
 
Jeu lean construction manufacturing
Jeu lean construction manufacturingJeu lean construction manufacturing
Jeu lean construction manufacturing
Nadia Gharbi
 
Dossier de production 120
Dossier de production 120Dossier de production 120
Dossier de production 120
phanjacky
 
Schéma Directeur France Boissons - Dossier de choix
Schéma Directeur France Boissons - Dossier de choixSchéma Directeur France Boissons - Dossier de choix
Schéma Directeur France Boissons - Dossier de choixAlexandre Colonna d'Istria
 
Lll
LllLll
Lll
RAEZER
 
Gpao 4 Juste à temps Kanban
Gpao 4 Juste à temps KanbanGpao 4 Juste à temps Kanban
Gpao 4 Juste à temps Kanban
ibtissam el hassani
 
Polymers 3D printing / Fabrication additive avec polymères - Etude Plastipoli...
Polymers 3D printing / Fabrication additive avec polymères - Etude Plastipoli...Polymers 3D printing / Fabrication additive avec polymères - Etude Plastipoli...
Polymers 3D printing / Fabrication additive avec polymères - Etude Plastipoli...
PLASTIPOLIS
 
Le juste à temps (JAT)
Le juste à temps (JAT)Le juste à temps (JAT)
Le juste à temps (JAT)
Hasnae SQUALLI HOUSSAINI
 
Présentation juste-à-temps (1)
Présentation juste-à-temps (1)Présentation juste-à-temps (1)
Présentation juste-à-temps (1)
Oussama Yous
 
Diaporama SMED.ppt
Diaporama SMED.pptDiaporama SMED.ppt
Diaporama SMED.ppt
Sou Tibon
 
L’innovation c’est payant 2013 | Industries Dettson
L’innovation c’est payant 2013 | Industries DettsonL’innovation c’est payant 2013 | Industries Dettson
L’innovation c’est payant 2013 | Industries DettsonSherbrooke Innopole
 
Jeu lean manufacturing
Jeu lean manufacturingJeu lean manufacturing
Jeu lean manufacturingCIPE
 
jeu gestion de projet agile 2015
jeu gestion de projet agile 2015jeu gestion de projet agile 2015
jeu gestion de projet agile 2015
CIPE
 
Pôle Position S45
Pôle Position S45Pôle Position S45
Pôle Position S45
Sylvie Defer
 

Similaire à Le "takt thinking" pour transformer l'entreprise par Norbert Dubost de Thales (20)

MIPE : Christelle Fenayon, Lean Tour TOURS, Nov.17
MIPE : Christelle Fenayon, Lean Tour TOURS, Nov.17MIPE : Christelle Fenayon, Lean Tour TOURS, Nov.17
MIPE : Christelle Fenayon, Lean Tour TOURS, Nov.17
 
Jeu de la maintenance stratégie
Jeu de la maintenance stratégieJeu de la maintenance stratégie
Jeu de la maintenance stratégie
 
Smed
SmedSmed
Smed
 
mon exposé fin d'etudes
mon exposé fin d'etudesmon exposé fin d'etudes
mon exposé fin d'etudes
 
COURS DE PRODUCTIONsdsdssdsds - Jad SMIDI.pdf
COURS DE PRODUCTIONsdsdssdsds - Jad SMIDI.pdfCOURS DE PRODUCTIONsdsdssdsds - Jad SMIDI.pdf
COURS DE PRODUCTIONsdsdssdsds - Jad SMIDI.pdf
 
Jeu lean construction manufacturing
Jeu lean construction manufacturingJeu lean construction manufacturing
Jeu lean construction manufacturing
 
Dossier de production 120
Dossier de production 120Dossier de production 120
Dossier de production 120
 
Schéma Directeur France Boissons - Dossier de choix
Schéma Directeur France Boissons - Dossier de choixSchéma Directeur France Boissons - Dossier de choix
Schéma Directeur France Boissons - Dossier de choix
 
Lll
LllLll
Lll
 
Gpao 4 Juste à temps Kanban
Gpao 4 Juste à temps KanbanGpao 4 Juste à temps Kanban
Gpao 4 Juste à temps Kanban
 
Polymers 3D printing / Fabrication additive avec polymères - Etude Plastipoli...
Polymers 3D printing / Fabrication additive avec polymères - Etude Plastipoli...Polymers 3D printing / Fabrication additive avec polymères - Etude Plastipoli...
Polymers 3D printing / Fabrication additive avec polymères - Etude Plastipoli...
 
Le juste à temps (JAT)
Le juste à temps (JAT)Le juste à temps (JAT)
Le juste à temps (JAT)
 
Présentation juste-à-temps (1)
Présentation juste-à-temps (1)Présentation juste-à-temps (1)
Présentation juste-à-temps (1)
 
Diaporama SMED.ppt
Diaporama SMED.pptDiaporama SMED.ppt
Diaporama SMED.ppt
 
L’innovation c’est payant 2013 | Industries Dettson
L’innovation c’est payant 2013 | Industries DettsonL’innovation c’est payant 2013 | Industries Dettson
L’innovation c’est payant 2013 | Industries Dettson
 
Jeu lean manufacturing
Jeu lean manufacturingJeu lean manufacturing
Jeu lean manufacturing
 
Lecon5
Lecon5Lecon5
Lecon5
 
jeu gestion de projet agile 2015
jeu gestion de projet agile 2015jeu gestion de projet agile 2015
jeu gestion de projet agile 2015
 
Dossier
DossierDossier
Dossier
 
Pôle Position S45
Pôle Position S45Pôle Position S45
Pôle Position S45
 

Plus de Institut Lean France

Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de criseLe "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise
Institut Lean France
 
Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise
Institut Lean France
 
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-CuthillBuild Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Institut Lean France
 
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Institut Lean France
 
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta MobilierThe story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
Institut Lean France
 
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix QontoWhy kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Institut Lean France
 
Management practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil DijouxManagement practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil Dijoux
Institut Lean France
 
Build hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre JannezBuild hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre Jannez
Institut Lean France
 
Lean organization framework by Pierre Masai
Lean organization framework by Pierre MasaiLean organization framework by Pierre Masai
Lean organization framework by Pierre Masai
Institut Lean France
 
The high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen WhitleyThe high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen Whitley
Institut Lean France
 
Story of LeSS by Bas Vodde
Story of LeSS by Bas VoddeStory of LeSS by Bas Vodde
Story of LeSS by Bas Vodde
Institut Lean France
 
True Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper BoegTrue Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper Boeg
Institut Lean France
 
Getting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair CockburnGetting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair Cockburn
Institut Lean France
 
Lean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves CaseauLean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves Caseau
Institut Lean France
 
A transformation journey for a complex development organization
A transformation journey for a complex development organizationA transformation journey for a complex development organization
A transformation journey for a complex development organization
Institut Lean France
 
Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?
Institut Lean France
 
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Institut Lean France
 
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla SaunierSe transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
Institut Lean France
 
Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018 Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018
Institut Lean France
 
Présentation BMI Lean Tour Blois 2018
Présentation BMI   Lean Tour Blois 2018Présentation BMI   Lean Tour Blois 2018
Présentation BMI Lean Tour Blois 2018
Institut Lean France
 

Plus de Institut Lean France (20)

Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de criseLe "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise
 
Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise
 
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-CuthillBuild Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
 
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
 
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta MobilierThe story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
 
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix QontoWhy kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
 
Management practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil DijouxManagement practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil Dijoux
 
Build hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre JannezBuild hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre Jannez
 
Lean organization framework by Pierre Masai
Lean organization framework by Pierre MasaiLean organization framework by Pierre Masai
Lean organization framework by Pierre Masai
 
The high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen WhitleyThe high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen Whitley
 
Story of LeSS by Bas Vodde
Story of LeSS by Bas VoddeStory of LeSS by Bas Vodde
Story of LeSS by Bas Vodde
 
True Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper BoegTrue Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper Boeg
 
Getting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair CockburnGetting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair Cockburn
 
Lean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves CaseauLean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves Caseau
 
A transformation journey for a complex development organization
A transformation journey for a complex development organizationA transformation journey for a complex development organization
A transformation journey for a complex development organization
 
Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?
 
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
 
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla SaunierSe transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
 
Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018 Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018
 
Présentation BMI Lean Tour Blois 2018
Présentation BMI   Lean Tour Blois 2018Présentation BMI   Lean Tour Blois 2018
Présentation BMI Lean Tour Blois 2018
 

Le "takt thinking" pour transformer l'entreprise par Norbert Dubost de Thales

  • 1. www.thalesgroup.com Thales Copyright 2018 LE ‘TAKT THINKING’ POUR TRANSFORMER L’ENTREPRISE LEAN SUMMIT 2018, Lyon Norbert Dubost, VP Operations & Industrie, THALES Microwave & Imaging Sub-Systems (MIS)
  • 2. 2 Thales Copyright 2018 Quelques mots sur mon parcours …VP Operations & Industrie, THALES Microwave & Imaging Sub-Systems (MIS) 1981 THOMSON CSF  THALES 2006 Rencontre avec le Lean 2010 Plongée sur le Gemba
  • 3. 3 Thales Copyright 2018 La relation au temps d’une grande entreprise issue historiquement du monde de la Défense
  • 4. 4 Thales Copyright 2018 Ma relation avec le temps … RÉUNION de 2H repoussée La JOURNÉE la plus EFFICACE : le jour du départ en vacances 19h03, Vendôme – Paris …
  • 5. 5 Thales Copyright 2018 Ma découverte du ‘Takt Thinking’ : AOA Vendôme (Angle of Attack) Fin 2014 : X12 les quantités livrés 3 sondes / jour  36 / jour en 6 mois ! Le TAKT THINKING MODIFIE PUISSAMMENT LE RAISONNEMENT INDUSTRIEL ÷ 12 Contenu de travail au poste, réactivité aux problèmes, intervalle de livraison, temps de formation,… X 12 tous les moyens, postes de travail, surface,…
  • 6. 6 Thales Copyright 2018 THALES Microwave & Imaging Sub-Systems (MIS)
  • 7. 7 Thales Copyright 2018 Chiffres-clés Microwave & Imaging Sub-Systems (MIS) 2 000 Références de produits 36000 produits livrés : Takt-Time = 2m30s 100 000 m2 de surface dont 10 000 m2 de salles blanches 619 brevets industriels en validité 11 bureaux commerciaux dans le monde 2 761 collaborateurs 1 000 CLIENTS 7 SITES Industriels (Vélizy, Thonon, Moirans X2, Ulm, Yoqneam, Shanghai) 538 M€ CA 2017 10% consacrés à la R&D € CA BELLE TECHNOLOGIE, BELLE POSITION SUR LES MARCHÉS, MAIS D’IMPORTANTES DIFFICULTÉS INDUSTRIELLES (RETARDS, RETOURS CLIENT, COÛTS DE PRODUCTION, …)
  • 8. 8 Thales Copyright 2018 Contexte Produit  Production Est-ce que vous savez combien le client en veux ? 1. Approvisionnement de matières et de pièces élémentaires 2. Contrôle et traitements thermochimiques des pièces élémentaires achetées et/ou fabriquées en interne 3. Fabrication des sous-ensembles de premier niveau (usinage, brasage, dépôt, métallisation…) 4. Assemblage des sous-ensembles tube en milieu propre (de 100 à 150 pièces par tube) 5. Fermeture des tubes 6. Etuvage/Pompage 1. Pré-habillage 2. Préréglage 3. Durcissage 4. Réglage final 5. Habillage tube durci 6. Déverminage 7. Sélection modèle de vol 8. Inspection client 9. Habillage tube déverminé 10. Recette Hyper-fréquence initiale 11. Recette Mécanique 12. Recette Vide Thermique 13. Recette Hyper-fréquence finale 14. Certificat de conformité 15. Acceptation client 16. Expédition AVALAMONT Non ?! Le client a besoin d’une pièce toutes les 1h45 Je ne travaille pas assez ?! Que pouvons-nous faire pour livrer une pièce toutes les 1h45 ? Un plan d’action de mon chef ? Que pouvons-nous faire pour livrer une pièce toutes les 1h45 ? Ah, vous voulez vraiment cela ! J’ai plein d’idées !
  • 9. 9 Thales Copyright 2018 Comment attraper le sujet de la transformation en PROFONDEUR mais RAPIDE ▌ Par le Gemba évidement ▌ Par la Qualité et l’Arrêt au 1er défaut bien entendu ▌ … MAIS besoin d’une implication forte et rapide des « têtes » ▌ le ‘Takt-Time Thinking’ : le meilleur de chacun au BON MOMENT UN ACCÉLÉRATEUR DE TRANSFORMATION LEAN : REVOIR LA RELATION AU TEMPS LONG
  • 10. 10 Thales Copyright 2018 Temps LONG VS Temps COURT QUARANTAINE POUR « CAPITALISER » Qualification Produit/Process CAPITALISATION SPC sous PC COMMISSIONS MOD Raisonnement à capacité infinie KPI & Reporting mensuel MYB (Budget) REVUES MENSUELLES Process achat multi-signatures 8D Une horloge dans mon bureau et dans tous les ateliers Les petits trains 1 X 1 heure (cf 19h03) 0 QUARANTAINE LA MODIFICATION DES DOSSIERS EN 24H L’ANDON : OBLIGATION AU CHEF D’INTERVENIR IMMÉDIATEMENT Les sms en fin de journée pour montrer l’intérêt du manager Salle boussole avec KPI hedbo Topo techniqu e/qualité chaque matin STOP & FIX
  • 11. 11 Thales Copyright 2018 L’introduction des Kanban, pour craquer l’influence du MRP2 KANBAN, AFFICHER « SANS MENTIR » LES BESOINS CLIENT DU MOMENT
  • 12. 12 Thales Copyright 2018 Le dans la ‘tête’ de TOUS: la Takt TimeTable Céramique EMBALLAGE Emballage Emballage Packaging Packing Hélice ESSAIS_TOP Goulot n°1 Finition Essais (3C) Acceptance Tests Final inspection Montant HAB_TOP Essais Habillage Goulot n°1 Prefoc/Foc/PBI/BI Test Canons / Cathodes Goulot n°1 POMPAGE_TOP Intégration Prépotting Housing Integration Sous ensemble Wenhelt MONTAGE_TOP Goulot n°3 Flexage Essais (2C) Goulot n°3 Pumping Picking Ensemble Cathode Wenhelt ESSAIS_GAC Front-end Pompage Final assembly Collecteurs MONTAGE_GAC Composants Goulot n1 Montage tube nu Guns Goulot n°2 Ligne SPACE Goulot n°2 ESSAIS_CUIVRE_CER Pavés Lines Tubes fermés SPACE MONTAGE_CUIVRE_CER Goulot n°2 Enceintes équipées Brasing Tubes pompés SPACE HAB_ESSAIS_IND Pieds de verre Turning of brased assembly Goulot n°3 TPR Préhabillage FINITION_IND Fenetres Metallisation Démarrage essai SPA Ka POMPAGE_IND Ecrans secondaires Chemical treatment Démarrage essai SPA Ku-Bande X ASSEMBLAGE_IND Ecrans primaires Goulot n°2 Mecanique Durcissage PA MADC Monoblocs Wire processing Réglage Ka REGDURCI PYRO Traitement thermique Cathods manufacturing Réglage Ku - X REGDURCI CHIMIE3 Caméras Supply of Velizy Goulot n°1 Habillage tube durci GRILLES Alimentations Mesures TDV0 Ka CATHODES Mesures TDV0 Ku - X BRASAGE TETE INDUSTRIEL Déverminage BRASAGE ANODES IND Mesures auto MECA_CN42 Sélection MECA_TRAUB Préparation mise en capot GT27 SP DATA Goulot n°3 CHIMIE Habillage tube déverminé CONTRÔLE D'ENTREE Recette initiale AUTO Vibration Vide thermique Recette finale AUTO Recette manuelle Nettoyage Contrôle Final Emballage EM tube PF spatial Atelier Tubes Pompés Atelier Salle Montage DEFSI Habillage - Essais DEFSI (EM tube PF) Contrôle sortie (CQP) Contrôle d'entrée Magasin DEFSI 4,4H / 2,3H 13 min / 9 min 28 min / 34 min 15 min / 12 min PAC3 3,5H / 3,5H 2,5H/2H SPACE 3,5H / 4,5H TL 11H / 6H Space TH 5H / 2H TAKT-TIME Sites CCI - SEMAINE 12 VELIZY THONON TRIXELL CPL / DPL ULM CMT AmontSpatialAMONTSpatialAVALDEFSICOMMUN TAKT-TIME DE LA SEMAINE VS TAKT-TIME DSP Principes : o TAKT-Time Hebdomadaire par chef d’atelier o Goulot n°1 => Immersion du Directeur Industriel en atelier pour « fixer » le problème o Solidarité inter-ateliers o Recherche systématique de ‘Plans B’ o … TAKT-TIME affichés en atelier
  • 13. 13 Thales Copyright 2018 Des résultats en 20 mois IMPLICATION DES GENS Suggestions : de 0 à 900 Absentéisme : -16% RETARDS DIVISÉS PAR 3 RETOURS CLIENTS DIVISÉS PAR 2 COÛTS DE NON QUALITÉ : -12 M€
  • 14. 14 Thales Copyright 2018 Conclusion LE TAKT THINKING  DONNER LE MEILLEUR DE SOI-MÊME À CHAQUE INSTANT pour les clients pour soi pour changer l’entreprise : passer du 4D au 4F  Defining what the problem is  Deciding which option is best  Driving people to implement it through an action plan  Dealing with consequences  Find the right problems in real life, on the gemba  Face the main challenges once the easy stuff has been cleared away  Frame them in a way that is understandable by everyone  Form new unexpected solutions through constant experimenting & learning
  • 15. 15 Thales Copyright 2018 Merci de votre attention