SlideShare une entreprise Scribd logo
Modèle d’évaluation probabiliste multi-risques
MnhPRA et la voie à suivre
Prof. Charles Scawthorn
Advisor, GFDRR / World Bank
Atelier sur la connaissance et l’évaluation des risques au Maroc
3 April 2017, Rabat
1
Swiss Agency
for Development
and Cooperation
 Aperçu du Partenariat GOM-Banque Mondiale
sur le Risque de Catastrophes
 MnhPRA - un résumé rapide
 Vision actuelle pour la prochaine étape
 Overview of GOM-World Bank Partnership on Disaster Risk
Management
 MnhPRA – a quick summary
 Current vision for the Next Step
Outline
#2
Al Hoceima 2004
2008: Phase 1, examen initial des risques pour le Maroc
(Risque de prix naturel, technologique, énergétique et des produits de base)
 Natural hazards (earthquake, flood, drought, landslide, tsunami)
Partenariat GOM-Banque Mondiale sur le Risque de Catastrophes
2009 ~ 2012: Développement de MnhPRA
• Morocco natural hazards Probabilistic Risk Analysis (MnhPRA)
• GIS / probabilistic risk analysis / Open Source
2012~2015: TA re Stratégie de gestion des risques de catastrophe et de financement
• National Insurance Law
• redirection of the Fonds de Lutte contre des Effets des Catastrophes Naturelles (FLCN)
2016~2021: P4R Prêt : USD 200 million leveraged 3:1  FLCN
2017~?: Cadre pour un système national d'analyse et d'information sur les risques
Future: Integrated DRM in Morocco
#5
Coopération étroite avec le gouvernement (MAGG, MOI ...)
Inter-Ministerial meeting(s)
Academic Review Panel
#6
MnhPRA analyse de risque
1. Identify Study
Region
3. Define and
Overlay Inventory
5. Estimate Losses
4. Compute Damage
2. Characterize
Hazard
Ce qui est mesuré, est géré What gets measured, gets managed
 FOSS (Free Open Source Software)
 Loss Estimation System
– Hazard data aggregation
– Exposure
– Vulnerability
– Risk Assessment
– LEC, AAL
MnhPRA – Morocco natural hazard Probabilistic Risk Assessment Software
# 7
 FOSS (Free Open Source Software)
 Système d'estimation des pertes
 Agrégation des données de
risque
 Exposition
 Vulnérabilité
 Évaluation des risques?
- LEC, AAL
# 8
Flood – Flood depths at 90 m aggregated to Residential, Industrial and Commercial Clusters
MnhPRA – Agrégation des données de risque
Inondation - Profondeurs d'inondation à 90 m agrégées en grappes résidentielles, industrielles et commerciales
# 9
Earthquake – PGA for 15000 stochastic events – Aggregated to commune level
MnhPRA – Agrégation des données de risque – Contd.,
Tremblement de terre - PGA pour 15 000 événements stochastiques - Niveau agrégé à la commune
#10
Exposition - Infrastructure
Airport
Railway
Road
Ports
Power
Station/Line
At Location Level
Built-up Areas captured from LANDSAT Image
#11
Industries
Commercial
Villa
Apartments
Moroccan
House
Grand Casablanca
Zones aménagées prises à partir de LANDSAT Image
Combined LEC for all three hazards
#12
0.00001
0.00010
0.00100
0.01000
0.10000
1.00000
- 50,000 100,000 150,000 200,000
ExceedanceProbabilityperyear
Loss in Million MAD
LEC Curve for all exposures
EQ
Flood
Tsunami
years
10
100
1,000
10,000
100,000
Courbes de dépassement de perte - trois risques
# 13
MnhPRA – Risk Metrics – EP Curve, AAL
Summary Tables EP Curve
Thematic Plots
Loss Distribution charts
What-if’s
#14
what where Minimal
damage
Life
Safety
protected rebuild optimum Cost
mns MAD
2013 2014 ~
18
201?
MnhPRA Documentation
MnhPRA entraînement (13-14 June, 6-7 Dec 2012 CNRST)
16
Stratégie nationale de gestion des risques et de financement
17
Partenariat GOM-Banque Mondiale sur le Risque de Catastrophes
2008: Phase 1, examen initial des risques pour le Maroc
(Risque de prix naturel, technologique, énergétique et des produits de base)
 Natural hazards (earthquake, flood, drought, landslide, tsunami)
2009 ~ 2012: Développement de MnhPRA
• Morocco natural hazards Probabilistic Risk Analysis (MnhPRA)
• GIS / probabilistic risk analysis / Open Source
2012~2015: TA re Stratégie de gestion des risques de catastrophe et de financement
• National Insurance Law
• redirection of the Fonds de Lutte contre des Effets des Catastrophes Naturelles (FLCN)
2016~2021: P4R Prêt : USD 200 million leveraged 3:1  FLCN
2017~?: Cadre pour un système national d'analyse et d'information sur les risques
Future: Integrated DRM in Morocco
Cadre pour un système national d'analyse et d'information sur les risques
19
Bureau national de gestion des risques
20
National Chief Risk Officer
• Risk Strategy Officer
• Communications Officer
• Technical Officers
• IT
• Natural Hazards
• Administration staff
Province Risk
Officer
Province Risk
Officer
Province Risk
Officer
Province Risk
Officer
Base de données nationale sur les risques
21
COEUR
22
Centre Officiel Pour L'excellence Dans L'utilisation Des Risques).
National Chief Risk Officer
• Risk Strategy Officer
• Communications Officer
• Administration staff
• Technical Officers
• IT
• Natural Hazards
Université(s)
Meteo, ING…
Bureau d’etudes
• Support technique pour les utilisateur
• Développement technique et logiciel
• Éducation en DRM
pour la prochaine génération
• Entraînement
Conclusion
23
 Banque mondiale
– En partenariat avec GOM (et SADC) depuis une décennie pour réduire le risque de
catastrophe du Maroc
– Contribution de MnhPRA, logiciel de gestion des risques gratuit
– Aides à l'élaboration d'une stratégie nationale de DRM et de financement des risques
– Aides à la «naissance» du programme DRF FLCN
– Prestation de prêt pour une opération FLCN de cinq ans
 MnhPRA est l'état de l'art
– Utilisé par ACAPS pour la gestion du programme d'assurance nationale du Maroc
– Certains utilisent d'autres - pourraient être mieux
– Une formation et une utilisation accrues seraient très bénéfiques
– Cependant, l'informatique se déplace rapidement - "MnhPRA 2.0" est nécessaire (base de
données nationale liée)
 Prochaines étapes: Bureau national de gestion des risques (NORM / NRAIS / CORE
#24
Thank You
Merci Pour votre attention
‫شكرا‬

Contenu connexe

Tendances

Plan vert fes
Plan vert fesPlan vert fes
Plan vert fessabouni21
 
Planification urbaine
Planification urbainePlanification urbaine
Planification urbaineSami Sahli
 
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
OECD Governance
 
Ader Fès - Risques dans la médina de fès
Ader Fès - Risques dans la médina de fèsAder Fès - Risques dans la médina de fès
Ader Fès - Risques dans la médina de fès
OECD Governance
 
Les risques naturels.pptx
Les risques naturels.pptxLes risques naturels.pptx
Les risques naturels.pptx
ssuserf216fa
 
6 maroc-final-aavb-aipcr
6 maroc-final-aavb-aipcr6 maroc-final-aavb-aipcr
6 maroc-final-aavb-aipcrTwilight Eagle
 
Paysage urbain
Paysage urbainPaysage urbain
Paysage urbain
imane assoul
 
Metre de batiment et tp
Metre de batiment et tpMetre de batiment et tp
Metre de batiment et tp
Chouaib Moula
 
Fiche 1 evolution de la notion de risque
Fiche  1    evolution de la notion de risqueFiche  1    evolution de la notion de risque
Fiche 1 evolution de la notion de risque
Halim ARROUDJ
 
Rapport de diagnostic
Rapport de diagnosticRapport de diagnostic
Rapport de diagnosticsabouni21
 
ocde-gestion-risques-maroc-atelier-novembre-2017 Table Ronde 3
ocde-gestion-risques-maroc-atelier-novembre-2017 Table Ronde 3ocde-gestion-risques-maroc-atelier-novembre-2017 Table Ronde 3
ocde-gestion-risques-maroc-atelier-novembre-2017 Table Ronde 3
OECD Governance
 
La démarche HQE²R
La démarche HQE²RLa démarche HQE²R
La démarche HQE²R
Soumia Rahmani
 
Cours plan installation de chantier - télécharger : http://goo.gl/krw1wE
Cours plan installation de chantier - télécharger : http://goo.gl/krw1wECours plan installation de chantier - télécharger : http://goo.gl/krw1wE
Cours plan installation de chantier - télécharger : http://goo.gl/krw1wE
Hani sami joga
 
Planification urbaine SNAT et SRAT
Planification urbaine SNAT et SRATPlanification urbaine SNAT et SRAT
Planification urbaine SNAT et SRAT
Archi Guelma
 
La culture, moteur économique et social pour les villes, d’après un nouveau r...
La culture, moteur économique et social pour les villes, d’après un nouveau r...La culture, moteur économique et social pour les villes, d’après un nouveau r...
La culture, moteur économique et social pour les villes, d’après un nouveau r...
La French Team
 
CNRST ING : Données
CNRST ING :  DonnéesCNRST ING :  Données
CNRST ING : Données
OECD Governance
 
Planification urbaine et développement durable
Planification urbaine et développement durablePlanification urbaine et développement durable
Planification urbaine et développement durableSami Sahli
 
3.7 diagnostic et traitement des pathologies structurelles du batiment . (1)
3.7 diagnostic et traitement des pathologies structurelles du batiment . (1)3.7 diagnostic et traitement des pathologies structurelles du batiment . (1)
3.7 diagnostic et traitement des pathologies structurelles du batiment . (1)
Ilhem Arfaoui
 

Tendances (20)

Plan vert fes
Plan vert fesPlan vert fes
Plan vert fes
 
Planification urbaine
Planification urbainePlanification urbaine
Planification urbaine
 
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
 
Ader Fès - Risques dans la médina de fès
Ader Fès - Risques dans la médina de fèsAder Fès - Risques dans la médina de fès
Ader Fès - Risques dans la médina de fès
 
Les risques naturels.pptx
Les risques naturels.pptxLes risques naturels.pptx
Les risques naturels.pptx
 
6 maroc-final-aavb-aipcr
6 maroc-final-aavb-aipcr6 maroc-final-aavb-aipcr
6 maroc-final-aavb-aipcr
 
Paysage urbain
Paysage urbainPaysage urbain
Paysage urbain
 
Metre de batiment et tp
Metre de batiment et tpMetre de batiment et tp
Metre de batiment et tp
 
Fiche 1 evolution de la notion de risque
Fiche  1    evolution de la notion de risqueFiche  1    evolution de la notion de risque
Fiche 1 evolution de la notion de risque
 
Rapport de diagnostic
Rapport de diagnosticRapport de diagnostic
Rapport de diagnostic
 
ocde-gestion-risques-maroc-atelier-novembre-2017 Table Ronde 3
ocde-gestion-risques-maroc-atelier-novembre-2017 Table Ronde 3ocde-gestion-risques-maroc-atelier-novembre-2017 Table Ronde 3
ocde-gestion-risques-maroc-atelier-novembre-2017 Table Ronde 3
 
La démarche HQE²R
La démarche HQE²RLa démarche HQE²R
La démarche HQE²R
 
La composition urbaine (2)
La composition urbaine (2)La composition urbaine (2)
La composition urbaine (2)
 
Cours plan installation de chantier - télécharger : http://goo.gl/krw1wE
Cours plan installation de chantier - télécharger : http://goo.gl/krw1wECours plan installation de chantier - télécharger : http://goo.gl/krw1wE
Cours plan installation de chantier - télécharger : http://goo.gl/krw1wE
 
Planification urbaine SNAT et SRAT
Planification urbaine SNAT et SRATPlanification urbaine SNAT et SRAT
Planification urbaine SNAT et SRAT
 
La culture, moteur économique et social pour les villes, d’après un nouveau r...
La culture, moteur économique et social pour les villes, d’après un nouveau r...La culture, moteur économique et social pour les villes, d’après un nouveau r...
La culture, moteur économique et social pour les villes, d’après un nouveau r...
 
CNRST ING : Données
CNRST ING :  DonnéesCNRST ING :  Données
CNRST ING : Données
 
Planification urbaine et développement durable
Planification urbaine et développement durablePlanification urbaine et développement durable
Planification urbaine et développement durable
 
3.7 diagnostic et traitement des pathologies structurelles du batiment . (1)
3.7 diagnostic et traitement des pathologies structurelles du batiment . (1)3.7 diagnostic et traitement des pathologies structurelles du batiment . (1)
3.7 diagnostic et traitement des pathologies structurelles du batiment . (1)
 
Pdau
PdauPdau
Pdau
 

Similaire à GFDRR : Banque mondiale modèle d’évaluation probabiliste multi-risques mnh pra

Marc Jacquet : Observatoire national des risques naturels en france
Marc Jacquet : Observatoire national des risques naturels en franceMarc Jacquet : Observatoire national des risques naturels en france
Marc Jacquet : Observatoire national des risques naturels en france
OECD Governance
 
Compétitivité et Risques : un paradoxe ?
Compétitivité et Risques : un paradoxe ?Compétitivité et Risques : un paradoxe ?
Compétitivité et Risques : un paradoxe ?
Rencontres Qalimediterranée
 
Présentation de l'OCDE 3 avril - Atelier sur la connaissance et l’évaluation ...
Présentation de l'OCDE 3 avril - Atelier sur la connaissance et l’évaluation ...Présentation de l'OCDE 3 avril - Atelier sur la connaissance et l’évaluation ...
Présentation de l'OCDE 3 avril - Atelier sur la connaissance et l’évaluation ...
OECD Governance
 
Agenda OECD Atelier 1 Evaluation des risques au maroc 2017
Agenda OECD Atelier 1 Evaluation des risques au maroc 2017Agenda OECD Atelier 1 Evaluation des risques au maroc 2017
Agenda OECD Atelier 1 Evaluation des risques au maroc 2017
OECD Governance
 
Management des risques ibtissam el hassani-chapitre1-2
Management des risques   ibtissam el hassani-chapitre1-2Management des risques   ibtissam el hassani-chapitre1-2
Management des risques ibtissam el hassani-chapitre1-2
ibtissam el hassani
 
management-risques-projet
 management-risques-projet  management-risques-projet
management-risques-projet
Es-sahli bilal
 
Giorgio Boni : Estimer impacts inondation infrastructures à gênes
Giorgio Boni : Estimer impacts inondation infrastructures à gênesGiorgio Boni : Estimer impacts inondation infrastructures à gênes
Giorgio Boni : Estimer impacts inondation infrastructures à gênes
OECD Governance
 
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
OECD Governance
 
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Agadir, 19-20...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Agadir, 19-20...Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Agadir, 19-20...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Agadir, 19-20...
OECD Governance
 
OCDE: Atelier Thématique 4 - Soutenir les efforts de relevement et de reconst...
OCDE: Atelier Thématique 4 - Soutenir les efforts de relevement et de reconst...OCDE: Atelier Thématique 4 - Soutenir les efforts de relevement et de reconst...
OCDE: Atelier Thématique 4 - Soutenir les efforts de relevement et de reconst...
OECD Governance
 
Session 5- risk assessment
Session 5- risk assessmentSession 5- risk assessment
Session 5- risk assessment
UNDP Climate
 
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
OECD Governance
 
OCDE : Atelier prévention des risques Maroc - 17 mai 2017
OCDE : Atelier prévention des risques Maroc - 17 mai 2017 OCDE : Atelier prévention des risques Maroc - 17 mai 2017
OCDE : Atelier prévention des risques Maroc - 17 mai 2017
OECD Governance
 
Presentation covacc mai 2016
Presentation covacc mai 2016Presentation covacc mai 2016
Presentation covacc mai 2016
ctndiaye
 
Présentation COVACC
Présentation COVACCPrésentation COVACC
Présentation COVACC
ctndiaye
 
DMN : Prévention risques métérologiques et climatiques
DMN : Prévention risques métérologiques et climatiquesDMN : Prévention risques métérologiques et climatiques
DMN : Prévention risques métérologiques et climatiques
OECD Governance
 
Développement d’un système low-cost d’alerte d’hydrométéorologique pour le ba...
Développement d’un système low-cost d’alerte d’hydrométéorologique pour le ba...Développement d’un système low-cost d’alerte d’hydrométéorologique pour le ba...
Développement d’un système low-cost d’alerte d’hydrométéorologique pour le ba...
Eldoux
 
Agenda OCDE Atelier 2 prevention des risques au maroc mai 2017
Agenda OCDE Atelier 2 prevention des risques au maroc mai 2017Agenda OCDE Atelier 2 prevention des risques au maroc mai 2017
Agenda OCDE Atelier 2 prevention des risques au maroc mai 2017
OECD Governance
 
DGPC : Etat des lieux
DGPC : Etat des lieuxDGPC : Etat des lieux
DGPC : Etat des lieux
OECD Governance
 
Projet d'appui de l'OCDE pour la gestion des risques au Maroc - Atelier 2-3 n...
Projet d'appui de l'OCDE pour la gestion des risques au Maroc - Atelier 2-3 n...Projet d'appui de l'OCDE pour la gestion des risques au Maroc - Atelier 2-3 n...
Projet d'appui de l'OCDE pour la gestion des risques au Maroc - Atelier 2-3 n...
OECD Governance
 

Similaire à GFDRR : Banque mondiale modèle d’évaluation probabiliste multi-risques mnh pra (20)

Marc Jacquet : Observatoire national des risques naturels en france
Marc Jacquet : Observatoire national des risques naturels en franceMarc Jacquet : Observatoire national des risques naturels en france
Marc Jacquet : Observatoire national des risques naturels en france
 
Compétitivité et Risques : un paradoxe ?
Compétitivité et Risques : un paradoxe ?Compétitivité et Risques : un paradoxe ?
Compétitivité et Risques : un paradoxe ?
 
Présentation de l'OCDE 3 avril - Atelier sur la connaissance et l’évaluation ...
Présentation de l'OCDE 3 avril - Atelier sur la connaissance et l’évaluation ...Présentation de l'OCDE 3 avril - Atelier sur la connaissance et l’évaluation ...
Présentation de l'OCDE 3 avril - Atelier sur la connaissance et l’évaluation ...
 
Agenda OECD Atelier 1 Evaluation des risques au maroc 2017
Agenda OECD Atelier 1 Evaluation des risques au maroc 2017Agenda OECD Atelier 1 Evaluation des risques au maroc 2017
Agenda OECD Atelier 1 Evaluation des risques au maroc 2017
 
Management des risques ibtissam el hassani-chapitre1-2
Management des risques   ibtissam el hassani-chapitre1-2Management des risques   ibtissam el hassani-chapitre1-2
Management des risques ibtissam el hassani-chapitre1-2
 
management-risques-projet
 management-risques-projet  management-risques-projet
management-risques-projet
 
Giorgio Boni : Estimer impacts inondation infrastructures à gênes
Giorgio Boni : Estimer impacts inondation infrastructures à gênesGiorgio Boni : Estimer impacts inondation infrastructures à gênes
Giorgio Boni : Estimer impacts inondation infrastructures à gênes
 
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
 
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Agadir, 19-20...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Agadir, 19-20...Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Agadir, 19-20...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Agadir, 19-20...
 
OCDE: Atelier Thématique 4 - Soutenir les efforts de relevement et de reconst...
OCDE: Atelier Thématique 4 - Soutenir les efforts de relevement et de reconst...OCDE: Atelier Thématique 4 - Soutenir les efforts de relevement et de reconst...
OCDE: Atelier Thématique 4 - Soutenir les efforts de relevement et de reconst...
 
Session 5- risk assessment
Session 5- risk assessmentSession 5- risk assessment
Session 5- risk assessment
 
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
Projet d’appui de l’OCDE pour la gestion des risques au Maroc - Marrakech, 2-...
 
OCDE : Atelier prévention des risques Maroc - 17 mai 2017
OCDE : Atelier prévention des risques Maroc - 17 mai 2017 OCDE : Atelier prévention des risques Maroc - 17 mai 2017
OCDE : Atelier prévention des risques Maroc - 17 mai 2017
 
Presentation covacc mai 2016
Presentation covacc mai 2016Presentation covacc mai 2016
Presentation covacc mai 2016
 
Présentation COVACC
Présentation COVACCPrésentation COVACC
Présentation COVACC
 
DMN : Prévention risques métérologiques et climatiques
DMN : Prévention risques métérologiques et climatiquesDMN : Prévention risques métérologiques et climatiques
DMN : Prévention risques métérologiques et climatiques
 
Développement d’un système low-cost d’alerte d’hydrométéorologique pour le ba...
Développement d’un système low-cost d’alerte d’hydrométéorologique pour le ba...Développement d’un système low-cost d’alerte d’hydrométéorologique pour le ba...
Développement d’un système low-cost d’alerte d’hydrométéorologique pour le ba...
 
Agenda OCDE Atelier 2 prevention des risques au maroc mai 2017
Agenda OCDE Atelier 2 prevention des risques au maroc mai 2017Agenda OCDE Atelier 2 prevention des risques au maroc mai 2017
Agenda OCDE Atelier 2 prevention des risques au maroc mai 2017
 
DGPC : Etat des lieux
DGPC : Etat des lieuxDGPC : Etat des lieux
DGPC : Etat des lieux
 
Projet d'appui de l'OCDE pour la gestion des risques au Maroc - Atelier 2-3 n...
Projet d'appui de l'OCDE pour la gestion des risques au Maroc - Atelier 2-3 n...Projet d'appui de l'OCDE pour la gestion des risques au Maroc - Atelier 2-3 n...
Projet d'appui de l'OCDE pour la gestion des risques au Maroc - Atelier 2-3 n...
 

Plus de OECD Governance

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators Slides
OECD Governance
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
OECD Governance
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
OECD Governance
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
OECD Governance
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
OECD Governance
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
OECD Governance
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
OECD Governance
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
OECD Governance
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
OECD Governance
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
OECD Governance
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023
OECD Governance
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
OECD Governance
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and Recommendations
OECD Governance
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdf
OECD Governance
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptx
OECD Governance
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptx
OECD Governance
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
OECD Governance
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
OECD Governance
 

Plus de OECD Governance (20)

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators Slides
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and Recommendations
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdf
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptx
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptx
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
 

Dernier

RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
AssociationAF
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
AssociationAF
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
AssociationAF
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
AssociationAF
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
AssociationAF
 
Accord-cadre entre le Saint-Siège et la République du Burundi sur des matiere...
Accord-cadre entre le Saint-Siège et la République du Burundi sur des matiere...Accord-cadre entre le Saint-Siège et la République du Burundi sur des matiere...
Accord-cadre entre le Saint-Siège et la République du Burundi sur des matiere...
nzigamasaboThadde
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
AssociationAF
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
AssociationAF
 
Le-programme-du-Nouveau-Front-Populaire-date-du-14-juin-2024.pdf
Le-programme-du-Nouveau-Front-Populaire-date-du-14-juin-2024.pdfLe-programme-du-Nouveau-Front-Populaire-date-du-14-juin-2024.pdf
Le-programme-du-Nouveau-Front-Populaire-date-du-14-juin-2024.pdf
lecourrierdesstrateg
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
AssociationAF
 
Animations du Pays d'Art et d'Histoire Aure Louron du 16 au 23 juin
Animations du Pays d'Art et d'Histoire Aure Louron du 16 au 23 juinAnimations du Pays d'Art et d'Histoire Aure Louron du 16 au 23 juin
Animations du Pays d'Art et d'Histoire Aure Louron du 16 au 23 juin
Philippe Villette
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
AssociationAF
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
AssociationAF
 

Dernier (13)

RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
 
Accord-cadre entre le Saint-Siège et la République du Burundi sur des matiere...
Accord-cadre entre le Saint-Siège et la République du Burundi sur des matiere...Accord-cadre entre le Saint-Siège et la République du Burundi sur des matiere...
Accord-cadre entre le Saint-Siège et la République du Burundi sur des matiere...
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
 
Le-programme-du-Nouveau-Front-Populaire-date-du-14-juin-2024.pdf
Le-programme-du-Nouveau-Front-Populaire-date-du-14-juin-2024.pdfLe-programme-du-Nouveau-Front-Populaire-date-du-14-juin-2024.pdf
Le-programme-du-Nouveau-Front-Populaire-date-du-14-juin-2024.pdf
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
 
Animations du Pays d'Art et d'Histoire Aure Louron du 16 au 23 juin
Animations du Pays d'Art et d'Histoire Aure Louron du 16 au 23 juinAnimations du Pays d'Art et d'Histoire Aure Louron du 16 au 23 juin
Animations du Pays d'Art et d'Histoire Aure Louron du 16 au 23 juin
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
 
RASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - SupportsRASAD du 9 et 10 mars 2023 Nancy - Supports
RASAD du 9 et 10 mars 2023 Nancy - Supports
 

GFDRR : Banque mondiale modèle d’évaluation probabiliste multi-risques mnh pra

  • 1. Modèle d’évaluation probabiliste multi-risques MnhPRA et la voie à suivre Prof. Charles Scawthorn Advisor, GFDRR / World Bank Atelier sur la connaissance et l’évaluation des risques au Maroc 3 April 2017, Rabat 1 Swiss Agency for Development and Cooperation
  • 2.  Aperçu du Partenariat GOM-Banque Mondiale sur le Risque de Catastrophes  MnhPRA - un résumé rapide  Vision actuelle pour la prochaine étape  Overview of GOM-World Bank Partnership on Disaster Risk Management  MnhPRA – a quick summary  Current vision for the Next Step Outline #2
  • 4. 2008: Phase 1, examen initial des risques pour le Maroc (Risque de prix naturel, technologique, énergétique et des produits de base)  Natural hazards (earthquake, flood, drought, landslide, tsunami) Partenariat GOM-Banque Mondiale sur le Risque de Catastrophes 2009 ~ 2012: Développement de MnhPRA • Morocco natural hazards Probabilistic Risk Analysis (MnhPRA) • GIS / probabilistic risk analysis / Open Source 2012~2015: TA re Stratégie de gestion des risques de catastrophe et de financement • National Insurance Law • redirection of the Fonds de Lutte contre des Effets des Catastrophes Naturelles (FLCN) 2016~2021: P4R Prêt : USD 200 million leveraged 3:1  FLCN 2017~?: Cadre pour un système national d'analyse et d'information sur les risques Future: Integrated DRM in Morocco
  • 5. #5 Coopération étroite avec le gouvernement (MAGG, MOI ...) Inter-Ministerial meeting(s) Academic Review Panel
  • 6. #6 MnhPRA analyse de risque 1. Identify Study Region 3. Define and Overlay Inventory 5. Estimate Losses 4. Compute Damage 2. Characterize Hazard Ce qui est mesuré, est géré What gets measured, gets managed
  • 7.  FOSS (Free Open Source Software)  Loss Estimation System – Hazard data aggregation – Exposure – Vulnerability – Risk Assessment – LEC, AAL MnhPRA – Morocco natural hazard Probabilistic Risk Assessment Software # 7  FOSS (Free Open Source Software)  Système d'estimation des pertes  Agrégation des données de risque  Exposition  Vulnérabilité  Évaluation des risques? - LEC, AAL
  • 8. # 8 Flood – Flood depths at 90 m aggregated to Residential, Industrial and Commercial Clusters MnhPRA – Agrégation des données de risque Inondation - Profondeurs d'inondation à 90 m agrégées en grappes résidentielles, industrielles et commerciales
  • 9. # 9 Earthquake – PGA for 15000 stochastic events – Aggregated to commune level MnhPRA – Agrégation des données de risque – Contd., Tremblement de terre - PGA pour 15 000 événements stochastiques - Niveau agrégé à la commune
  • 11. Built-up Areas captured from LANDSAT Image #11 Industries Commercial Villa Apartments Moroccan House Grand Casablanca Zones aménagées prises à partir de LANDSAT Image
  • 12. Combined LEC for all three hazards #12 0.00001 0.00010 0.00100 0.01000 0.10000 1.00000 - 50,000 100,000 150,000 200,000 ExceedanceProbabilityperyear Loss in Million MAD LEC Curve for all exposures EQ Flood Tsunami years 10 100 1,000 10,000 100,000 Courbes de dépassement de perte - trois risques
  • 13. # 13 MnhPRA – Risk Metrics – EP Curve, AAL Summary Tables EP Curve Thematic Plots Loss Distribution charts
  • 14. What-if’s #14 what where Minimal damage Life Safety protected rebuild optimum Cost mns MAD 2013 2014 ~ 18 201?
  • 16. MnhPRA entraînement (13-14 June, 6-7 Dec 2012 CNRST) 16
  • 17. Stratégie nationale de gestion des risques et de financement 17
  • 18. Partenariat GOM-Banque Mondiale sur le Risque de Catastrophes 2008: Phase 1, examen initial des risques pour le Maroc (Risque de prix naturel, technologique, énergétique et des produits de base)  Natural hazards (earthquake, flood, drought, landslide, tsunami) 2009 ~ 2012: Développement de MnhPRA • Morocco natural hazards Probabilistic Risk Analysis (MnhPRA) • GIS / probabilistic risk analysis / Open Source 2012~2015: TA re Stratégie de gestion des risques de catastrophe et de financement • National Insurance Law • redirection of the Fonds de Lutte contre des Effets des Catastrophes Naturelles (FLCN) 2016~2021: P4R Prêt : USD 200 million leveraged 3:1  FLCN 2017~?: Cadre pour un système national d'analyse et d'information sur les risques Future: Integrated DRM in Morocco
  • 19. Cadre pour un système national d'analyse et d'information sur les risques 19
  • 20. Bureau national de gestion des risques 20 National Chief Risk Officer • Risk Strategy Officer • Communications Officer • Technical Officers • IT • Natural Hazards • Administration staff Province Risk Officer Province Risk Officer Province Risk Officer Province Risk Officer
  • 21. Base de données nationale sur les risques 21
  • 22. COEUR 22 Centre Officiel Pour L'excellence Dans L'utilisation Des Risques). National Chief Risk Officer • Risk Strategy Officer • Communications Officer • Administration staff • Technical Officers • IT • Natural Hazards Université(s) Meteo, ING… Bureau d’etudes • Support technique pour les utilisateur • Développement technique et logiciel • Éducation en DRM pour la prochaine génération • Entraînement
  • 23. Conclusion 23  Banque mondiale – En partenariat avec GOM (et SADC) depuis une décennie pour réduire le risque de catastrophe du Maroc – Contribution de MnhPRA, logiciel de gestion des risques gratuit – Aides à l'élaboration d'une stratégie nationale de DRM et de financement des risques – Aides à la «naissance» du programme DRF FLCN – Prestation de prêt pour une opération FLCN de cinq ans  MnhPRA est l'état de l'art – Utilisé par ACAPS pour la gestion du programme d'assurance nationale du Maroc – Certains utilisent d'autres - pourraient être mieux – Une formation et une utilisation accrues seraient très bénéfiques – Cependant, l'informatique se déplace rapidement - "MnhPRA 2.0" est nécessaire (base de données nationale liée)  Prochaines étapes: Bureau national de gestion des risques (NORM / NRAIS / CORE
  • 24. #24 Thank You Merci Pour votre attention ‫شكرا‬